Concrete
From Wikimedia Commons, the free media repository
Contents |
[edit] Casting
[edit] Finished structures
[edit] Pump
[edit] Pre-casting
[edit] Post-casting, broken open
[edit] Post-casting, cut open
[edit] Joints
-
Perimeter slab edge joint with incomplete firestop.
[edit] Through-penetrations
Main Gallery: Firestop
- Concrete structures often have a fire-resistance rating, due to concrete's excellent fire-resistance. Openings must be firestopped to comply with building codes in order to restore the rating of the assembly.
-
Unsealed cable through-penetration in control room of coal-fired power plant.
-
Unsealed cable through-penetration in control room of coal-fired power plant.
-
Unsealed cable through-penetration in control room of coal-fired power plant.
-
Cross barrier in a German power plant using firestop mortar.
-
Cross barrier fire test in Germany
-
Fire test with a firestop mortar inside a concrete floor slab.
[edit] Secondary Efflorescence
[edit] history
-
Hennebique House (1894-1904 build) first concrete building in France. Bourg-la-Reine