File:5n PERT graph with critical path.svg

From Wikimedia Commons, the free media repository
Jump to: navigation, search
5n_PERT_graph_with_critical_path.svg(SVG file, nominally 405 × 188 pixels, file size: 4 KB)
Description

The graph was created with Graphviz from the graph specification below.

Date

12 January 2007(2007-01-12)

Source

Own work

Author
Permission
(Reusing this file)

The image is in the public domain.

digraph untitl {
        node [ fontname="Helvetica-Bold", shape="circle", width="0.3", style ="setlinewidth(2),filled" color="black", fillcolor = "pink", label=""];
        edge [ fontname="Helvetica-Bold", fontsize="16", style="bold" ];
        graph [ rankdir="LR", ranksep="0.4"];
        { rank = same; B, D }
        
        A -> B [ label = "3", color="red"];
        B -> C [ label = "2"];
        B -> E [ label = "1", color="red"];
        E -> C [ label = "3", color="red"];
        A -> D [ label = "2"];
        D -> C [ label = "3"];

}


PD-icon.svg This file is ineligible for copyright and therefore in the public domain, because it consists entirely of information that is common property and contains no original authorship.

Afrikaans | العربية | ‪Беларуская (тарашкевіца)‬ | Български | Bosanski | Català | Česky | Dansk | Deutsch | English | Esperanto | Español | Eesti | فارسی | Suomi | Français | עברית | हिन्दी | Magyar | Հայերեն | Italiano | 日本語 | 한국어 | 文言 | Македонски | മലയാളം | Plattdüütsch | Nederlands | ‪Norsk (nynorsk)‬ | Polski | Português | Português do Brasil | Русский | Српски / Srpski | Svenska | ไทย | Türkçe | Vèneto | 中文 | ‪中文(简体)‬ | ‪中文(繁體)‬ | +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:07, 13 January 2007Thumbnail for version as of 13:07, 13 January 2007405 × 188 (4 KB)Illes (talk | contribs) ({{Information |Description=The graph was created with Graphviz from the graph specification below. |Source=own work |Date=January 12, 2007 |Author=hu:User:Illes |Permission=The image is in the public domain. }} <pre> digraph untitl { node [ fontname=)

The following 3 pages link to this file:

File usage on other wikis

The following other wikis use this file:

Metadata

Personal tools
Namespaces
Variants
Actions
Navigation
Participate
Toolbox
In Wikipedia