Category:Gemini 5
Appearance
English: Gemini 5
human spaceflight Vista de Cap Canaveral des de la nau Gemini 5 | |||||
| Upload media | |||||
| Spoken text audio | ⓘ | ||||
|---|---|---|---|---|---|
| Instance of | |||||
| Part of | |||||
| Operator | |||||
| Start point | |||||
| Space launch vehicle | |||||
| UTC date of spacecraft launch |
| ||||
| Type of orbit | |||||
| Significant event |
| ||||
| Mass |
| ||||
| Duration |
| ||||
| Follows | |||||
| Followed by | |||||
| |||||
Subcategories
This category has the following 9 subcategories, out of 9 total.
Media in category "Gemini 5"
The following 68 files are in this category, out of 68 total.
-
255-CC-65-HC-503.jpg 1,295 × 1,624; 524 KB
-
255-CC-65-HC-503.tif 6,478 × 8,122; 77.98 MB
-
255-CC-65-HC-603, back.tif 6,478 × 8,122; 82.33 MB
-
255-CC-65-HC-603.jpg 1,218 × 971; 248 KB
-
255-CC-65-HC-603.tif 6,478 × 8,122; 74.5 MB
-
All Systems Go NASA 1963.webm 20 min 57 s, 678 × 442; 353.71 MB
-
Astronaut Charles Conrad - Gemini-5 Spacecraft - Post-Launch (s65-45683).jpg 4,074 × 4,074; 1.38 MB
-
Astronaut Charles Conrad as seen through Gemini 5 spacecraft window (s65-45610).jpg 3,806 × 3,700; 531 KB
-
Astronaut L. Gordon Cooper Jr. has his blood pressure checked by Dr. Charles A. Berry.jpg 5,760 × 3,710; 2.33 MB
-
Astronauts Charles Conrad Jr. (right) and L. Gordon Cooper Jr. during suiting up.jpg 2,975 × 1,946; 3.65 MB
-
BEING HOISTED TO WHITE ROOM - CAPE (s65-41890).jpg 4,312 × 2,810; 2.19 MB
-
Christopher Kraft at Flight Director Console (cropped).jpg 964 × 1,003; 1.25 MB
-
Christopher Kraft at Flight Director Console.jpg 4,667 × 3,667; 20.4 MB
-
Conrad and Cooper Practice Survival Training - GPN-2000-001477.jpg 3,000 × 2,283; 4.49 MB
-
EARTH-SKY - GEMINI-TITAN (GT)-5 (70mm Hasselblad) (s65-45717).jpg 3,738 × 3,619; 2.72 MB
-
Gemini 5 control center2.jpg 4,095 × 1,758; 2.31 MB
-
Gemini 5 control room.jpg 4,295 × 3,157; 2.18 MB
-
Gemini 5 crew Cooper and Conrad in U.S. House of Representatives - S65-44234.jpg 3,000 × 2,425; 1.04 MB
-
Gemini 5 Elliot See water egress training.jpg 3,968 × 5,790; 3.46 MB
-
Gemini 5 Flown Silver Fliteline Medallion.jpg 5,301 × 2,660; 6.33 MB
-
Gemini 5 Hit by Micrometeorite (54302568667).jpg 2,783 × 4,000; 2.3 MB
-
Gemini 5 power.jpg 610 × 768; 58 KB
-
Gemini 5 spacecraft - after mission.jpg 4,132 × 3,299; 1.77 MB
-
Gemini Mission Control - GPN-2000-001405.jpg 3,000 × 2,076; 4.36 MB
-
Gemini V Mission Image - Over-exposed - DPLA - 698cc9b5facb884e142b806d3a026c2e.jpg 2,800 × 2,921; 1.01 MB
-
GEMINI-TITAN (GT)-5 - EARTH-SKY - (70mm HASSELBLAD) (s65-45697).jpg 3,630 × 3,534; 1.71 MB
-
GEMINI-TITAN (GT)-5 - EARTH-SKY - (70mm HASSELBLAD) (s65-45748).jpg 3,173 × 3,291; 2.75 MB
-
GEMINI-TITAN (GT)-5 - EQUIPMENT (OPTICAL & PHOTOGRAPHIC) - CAPE (s65-43482).jpg 3,620 × 4,654; 2.22 MB
-
Gemini-Titan (GT)-5 - On Pad (Erector being Lowered) - Cape (S65-49568).jpg 3,000 × 2,400; 1.03 MB
-
GEMINI-TITAN (GT)-5 - PILOT - SUITING-UP - CLOSEUP - CAPE (s65-46377).jpg 3,443 × 4,306; 3.16 MB
-
GEMINI-TITAN (GT)-5 - STOWAGE REVIEW (MANUFACTURING) - MO (s65-43449).jpg 3,622 × 4,679; 2.54 MB
-
GEMINI-TITAN (GT)-5 - TRAINING - SUITING-UP (ADJUSTS HELMET) - CAPE.jpg 2,786 × 4,296; 1.51 MB
-
GEMINI-TITAN (GT)-V - PILOT - SUITING-UP - CAPE (s65-46374).jpg 2,804 × 4,308; 1.53 MB
-
GEMINI-TITAN (GT)-V - PRIME CREW - WALK UP RAMP - CAPE (s65-28737).jpg 8,266 × 6,613; 7.44 MB
-
GEMINI-TITAN (GT)-V - TEST - CAPE (s65-41955).jpg 4,651 × 3,666; 2.37 MB
-
Gemini-Titan 5 at Cape Canaveral LC-19 - S65-43447.jpg 2,400 × 3,000; 958 KB
-
Gilruth-Cooper-Conrad-S65-45041.jpg 3,000 × 2,400; 3.82 MB
-
Gordon Cooper and Pete Conrad receive a standing ovation from U.S. House.jpg 2,400 × 1,940; 777 KB
-
Gordon Cooper Jr. is being weighed and balanced in the Pyrotechnic Installation Building.jpg 3,690 × 4,671; 3.82 MB
-
GT-5 Recovery Conrad tweaks Coopers beard (s65-46638).jpg 3,732 × 3,732; 2.2 MB
-
GT-5 Recovery Slice Cake (s65-51660).jpg 4,146 × 2,729; 1.8 MB
-
JAaron.jpg 287 × 431; 78 KB
-
Kranz on Console - GPN-2000-001406.jpg 3,000 × 2,000; 3.69 MB
-
Nl-Gemini 5-Article.ogg 4 min 6 s; 2.12 MB
-
Pete Conrad - egress training.jpg 3,010 × 1,980; 1.08 MB
-
Project Gemini Mission Review NASA 1965.webm 15 min 52 s, 678 × 442; 367.53 MB
-
RECOVERY (PRIME CREW STEP OUT) - GEMINI-TITAN (GT)-5 - FROGMEN - ATLANTIC (s65-51653).jpg 4,149 × 2,724; 3.15 MB
-
S-65-44212.jpg 296 × 206; 14 KB
-
S65-28694 (26086771934).jpg 2,293 × 3,000; 746 KB
-
S65-39907 (26088398153).jpg 4,777 × 3,624; 8.9 MB
-
S65-46990.jpg 2,976 × 3,000; 1.33 MB
-
The Gemini-5 spacecraft is hoisted to the top of the gantry at Pad 19.jpg 2,319 × 3,000; 1.07 MB
-
TRAINING (WATER EGRESS) - GEMINI-TITAN (GT)-5 - PRIME CREW - GULF (s65-39935).jpg 4,679 × 4,701; 4.42 MB
-
View of Astronaut Charles Conrad Jr in Gemini 5 spacecraft (s65-48759).jpg 2,638 × 4,015; 1.44 MB
-
VISUAL ACUITY (EXPERIMENTS) (s65-35589).jpg 4,733 × 4,699; 3.89 MB
-
VISUAL ACUITY - EXPERIMENT - GEMINI-TITAN (GT)-5 - FL (s65-28639).jpg 3,762 × 4,815; 905 KB