File:Beach refurbishment at Branksome Chine beach - geograph.org.uk - 118179.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search
Beach_refurbishment_at_Branksome_Chine_beach_-_geograph.org.uk_-_118179.jpg(640 × 480 pixels, file size: 98 KB, MIME type: image/jpeg)

Summary[edit]

Description
English: Beach refurbishment at Branksome Chine beach. The beach end of the £5million Poole Harbour deep water channel dredging and beach rebuilding project, a 24 hour/7day contract throughout December 2005 and January 2006. This major project has 2 main benefits in refurbishing the Blue Flag award winning beaches providing additional coastal protection and at the same time improving the deep water access for car ferries and commercial shipping into Poole.
Date
Source From geograph.org.uk
Author peter lloyd
Attribution
(required by the license)
peter lloyd / Beach refurbishment at Branksome Chine beach / CC BY-SA 2.0
peter lloyd / Beach refurbishment at Branksome Chine beach
Camera location50° 42′ 20″ N, 1° 54′ 36″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMap - Google Earthinfo
Object location50° 42′ 23″ N, 1° 54′ 32″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMap - Google Earthinfo

Licensing[edit]

Geograph depth small.png
This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by peter lloyd and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
w:en:Creative Commons

attribution share alike

This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: peter lloyd
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must attribute the work in the manner specified by the author or licensor (but not in any way that suggests that they endorse you or your use of the work).
  • share alike – If you alter, transform, or build upon this work, you may distribute the resulting work only under the same or similar license to this one.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current00:29, 31 January 2010Thumbnail for version as of 00:29, 31 January 2010640 × 480 (98 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Beach refurbishment at Branksome Chine beach. The beach end of the £5million Poole Harbour deep water channel dredging and beach rebuilding project, a 24 hour/7day contract throughout December 2005
  • You cannot overwrite this file.

There are no pages that link to this file.

Metadata