File:Scout Moor Wind Farm Construction Base - geograph.org.uk - 860677.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Scout_Moor_Wind_Farm_Construction_Base_-_geograph.org.uk_-_860677.jpg(640 × 480 pixels, file size: 83 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Scout Moor Wind Farm Construction Base. On Saturday the 31st of May 2008 the last of the twenty six turbine towers was

delivered to the Scout Moor Wind Farm construction site. The three tower sections, seen here at the holding compound in Scout Moor quarry, were to become Turbine No 17 which was constructed during the first week of June 2008. It was almost 6 months to the day since the first tower was delivered back in November 2007 https://www.geograph.org.uk/photo/621442 830678 824546 860666 687214 855911 696211

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80

collet heavy transport
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Scout Moor Wind Farm Construction Base / 
Paul Anderson / Scout Moor Wind Farm Construction Base
Camera location53° 39′ 53″ N, 2° 16′ 56″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 53″ N, 2° 16′ 56″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:36, 21 February 2011Thumbnail for version as of 06:36, 21 February 2011640 × 480 (83 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Scout Moor Wind Farm Construction Base On Saturday the 31st of May 2008 the last of the twenty six turbine towers was delivered to the Scout Moor Wind Farm construction site. The three tower sect

There are no pages that use this file.

Metadata