File:Shooter's Bottom wind turbine at dusk - geograph.org.uk - 1385624.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Shooter's_Bottom_wind_turbine_at_dusk_-_geograph.org.uk_-_1385624.jpg(640 × 400 pixels, file size: 34 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Shooter's Bottom wind turbine at dusk The wind turbine was completed and set in motion on 13th June 2008, and is the first such turbine in Somerset. Its rotor diameter is 70m, and it has a 2MW capacity. Apparently, it will provide enough green electricity each year to power 5% of the homes in the Mendip district. It is claimed that if another nineteen are added then all the homes in this part of Somerset could be powered by a clean, local power source.
Date
Source From geograph.org.uk
Author Sharon Loxton
Attribution
(required by the license)
InfoField
Sharon Loxton / Shooter's Bottom wind turbine at dusk / 
Sharon Loxton / Shooter's Bottom wind turbine at dusk
Camera location51° 15′ 08″ N, 2° 34′ 34″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location51° 15′ 18″ N, 2° 35′ 02″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Sharon Loxton
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.



File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:35, 28 February 2011Thumbnail for version as of 19:35, 28 February 2011640 × 400 (34 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Shooter's Bottom wind turbine at dusk The wind turbine was completed and set in motion on 13th June 2008, and is the first such turbine in Somerset. Its rotor diameter is 70m, and it has a 2MW capa

There are no pages that use this file.

Metadata