File:Lift Bridge (28197147584).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(677 × 1,400 pixels, file size: 693 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description

Taken from the bridge that is right next to it and now carries highway traffic and pedestrians. This older bridge does continue to carry freight trains on the lower level and the lift still is in operation to allow taller craft to pass through. This is a vertical merge of four images and then converted to BW with Silver Efex Pro.

The Carlton Bridge is a railroad vertical-lift bridge which carries one rail line over the Kennebec River between Bath and Woolwich, Maine. It was completed in 1927. Until August 1, 2000, it also carried two lanes of U.S. Route 1 (US 1) on its upper deck, after which the highway was transferred to the adjoining Sagadahoc Bridge and the road connection severed. The majority of the road deck remains but may be removed in the future. It is the last downstream fixed crossing of the Kennebec.

With the removal of US 1 from the bridge, its primary traffic is freight trains operated by the Maine Eastern Railroad that are bound for manufacturers in Thomaston, of which several pass over the bridge per week. It has also carried passenger excursion trains to Rockland, though the Maine Department of Transportation's leasing the line to another company will likely mean the end of passenger service after 2015.

The 88-year-old bridge failed an inspection in the fall of 2013, resulting in its closure from February 23 to 25, 2014, for an in-depth inspection and load test. The in-depth inspection found that steel has been rusting away from the bridge and at least one beam needs repair. Despite the deficiencies found, MDOT has stated that the problems do not currently impair the running of trains across the bridge. No restrictions have been placed on the use of the bridge, though MDOT requests that the Maine Eastern Railroad notify it of the days trains pass over the bridge. No decisions have yet been made about how to address the deficiencies, though options include repainting the bridge, removing the remaining road deck, or even its closure.[Wikipedia]
Date
Source Lift Bridge
Author Paul VanDerWerf from Brunswick, Maine, USA

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Me in ME at https://flickr.com/photos/12357841@N02/28197147584 (archive). It was reviewed on 12 July 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

12 July 2018

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current00:43, 12 July 2018Thumbnail for version as of 00:43, 12 July 2018677 × 1,400 (693 KB)Hiàn (alt) (talk | contribs)Transferred from Flickr via #flickr2commons

There are no pages that use this file.

Metadata