File:The old section of this trail had unsustainable drainage conditions. It was closed off and rehabbed. The trail crew constructed (5aca94ea-6eda-4df1-bf03-014e7dccb3db).jpg
Jump to navigation
Jump to search
Size of this preview: 449 × 599 pixels. Other resolutions: 180 × 240 pixels | 573 × 765 pixels.
Original file (573 × 765 pixels, file size: 218 KB, MIME type: image/jpeg)