File:The very first completed wind turbine on Scout Moor - geograph.org.uk - 633643.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

The_very_first_completed_wind_turbine_on_Scout_Moor_-_geograph.org.uk_-_633643.jpg(640 × 480 pixels, file size: 30 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: The very first completed wind turbine on Scout Moor. During the second week of December 2007 tower number 21 was the very first wind turbine out of a total of 26 to be built was completed on Scout Moor.

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80

631116 631129 632552 632559 632495 632554 632563 632569 632576 632582 696996

For more information about Scout Moor wind farm click on http://www.scoutmoorwindfarm.co.uk/indexorig.html

Scout Moor Wind Farm Picture Gallery

https://www.geograph.org.uk/gallery/scout_moor_wind_farm_under_construction_6568
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / The very first completed wind turbine on Scout Moor / 
Paul Anderson / The very first completed wind turbine on Scout Moor
Camera location53° 39′ 57″ N, 2° 14′ 35″ W  Heading=135° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 54″ N, 2° 14′ 29″ W  Heading=135° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current10:46, 7 February 2011Thumbnail for version as of 10:46, 7 February 2011640 × 480 (30 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=The very first completed wind turbine on Scout Moor During the second week of December 2007 tower number 21 was the very first wind turbine out of a total of 26 to be built was completed on Scout Mo

There are no pages that use this file.

Metadata