File:Waterproofing installation at the secant wall of the Track A approach structure which transitions trains from surface track to the tunnel below ground. (CH061A, 12-12-2017) (25191183338) (2).jpg
Jump to navigation
Jump to search
Size of this preview: 450 × 600 pixels. Other resolutions: 180 × 240 pixels | 360 × 480 pixels | 576 × 768 pixels | 768 × 1,024 pixels | 1,512 × 2,016 pixels.
Original file (1,512 × 2,016 pixels, file size: 803 KB, MIME type: image/jpeg)