File:Wind turbine construction, Pougny, E10-13.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,608 × 3,456 pixels, file size: 4 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
Français : Grue sur chenilles Terex Superlift 3800 en phase de descente (flexion importante du mât treillis), qui vient d'être utilisée pour la construction de l'éolienne Enercon n° 10 (E10). Le mât ne repose pas encore sur les poutres en bois (situées vers le milieu du mât). Au lieu-dit Champ Berthier, Pougny, Nièvre, France.
Date
Source Own work
Author Cjp24

Licensing[edit]

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Annotations
InfoField
This image is annotated: View the annotations at Commons

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:59, 23 November 2018Thumbnail for version as of 08:59, 23 November 20184,608 × 3,456 (4 MB)Cjp24 (talk | contribs)User created page with UploadWizard

The following page uses this file:

Metadata