File:2022-06-18 Dag van de Bouw Uithoornlijn halte Uithoorn Centrum (3).jpg
Zur Navigation springen
Zur Suche springen
Größe dieser Vorschau: 799 × 600 Pixel. Weitere Auflösungen: 320 × 240 Pixel | 639 × 480 Pixel | 1.023 × 768 Pixel | 1.280 × 961 Pixel | 2.560 × 1.922 Pixel | 4.592 × 3.448 Pixel.
Originaldatei (4.592 × 3.448 Pixel, Dateigröße: 7,68 MB, MIME-Typ: image/jpeg)
Kategorien:
- Dag van de Bouw 2022
- Tram stops in the Netherlands
- Tramline 25 in Amsterdam (from 2020)
- Transport in Uithoorn
- Construction workers in the Netherlands
- Rail transport construction sites in the Netherlands
- Construction sites in North Holland
- 2022 in tram transport in the Netherlands
- June 2022 in rail transport in the Netherlands
- 2022 in Uithoorn