File:Mir May 7 1996 configuration drawing.png

出自Wikimedia Commons
跳至導覽 跳至搜尋

原始檔案(1,797 × 1,673 像素,檔案大小:180 KB,MIME 類型:image/png

說明

說明

添加單行說明來描述出檔案所代表的內容

摘要

[編輯]
描述 The Mir complex on May 7, 1996, with all base block ports occupied. Priroda had docked with the station initially on April 26 and subsequently had been relocated to the +Z port. Progress-M 31 docked at the -X port to complete the configuration.
來源 http://ston.jsc.nasa.gov/collections/TRS/_techrep/TP-1998-208920.pdf
作者 NASA
授權許可
(重用此檔案)
PD

授權條款

[編輯]
Public domain 本作品由NASA創作,屬於公有領域。根據NASA的版權政策:“NASA的創作除非另有聲明否則不受版權保護。”(參見:Template:PD-USGov/zhNASA版權政策JPL圖像使用政策
警告:

檔案歷史

點選日期/時間以檢視該時間的檔案版本。

日期/時間縮⁠圖尺寸使用者備⁠註
目前2006年8月28日 (一) 19:14於 2006年8月28日 (一) 19:14 版本的縮圖1,797 × 1,673(180 KB)Bricktop留言 | 貢獻== Summary == {{Information |Description=The Mir complex on May 7, 1996, with all base block ports occupied. Priroda had docked with the station initially on April 26 and subsequently had been relocated to the +Z port. Progress-M 31 docked at the -X port

下列頁面有用到此檔案:

全域檔案使用狀況

以下其他 wiki 使用了這個檔案: