Category:East Side Access construction/2019/07/26
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/07/26"
The following 29 files are in this category, out of 29 total.
-
Elevator frame installation in the LIRR Terminal. 07-23-2019 (48382833261).jpg 4,032 × 3,024; 4.01 MB
-
Installing supports along the future LIRR concourse. 07-25-2019 (48382833166).jpg 4,032 × 3,024; 2.23 MB