Category:East Side Access in Sunnyside
Jump to navigation
Jump to search
Subcategories
This category has the following 4 subcategories, out of 4 total.
E
S
Media in category "East Side Access in Sunnyside"
The following 169 files are in this category, out of 169 total.
-
Amtrak ET crew measures catenary guy wire. (FHA02, 03-22-2018) (41073822022).jpg 2,826 × 2,014; 1.22 MB
-
Backfilling over an underdrain east of Queens Blvd. 06-26-19 (48146738277).jpg 1,512 × 2,016; 1,022 KB
-
Backfilling the walkway adjacent to tracks east of Thomson Ave. 08-05-2019 (48497492152).jpg 1,512 × 2,016; 1.42 MB
-
CQ033 - East of Queens BLVD - Placing LWA - (05-29-2018) (41876991504).jpg 2,016 × 1,512; 825 KB
-
Crew pulls cable for new CIL signal hut. (FHA02, 04-13-2018) (27557937118).jpg 3,200 × 2,302; 1.04 MB
-
Demolition of a obsolete Amtrak building in Queens. (CQ033, 01-29-2019) (33074925948).jpg 2,016 × 1,512; 1.02 MB
-
Demolition of a obsolete Amtrak building in Queens. (CQ033, 01-29-2019) (46898318352).jpg 1,512 × 2,016; 1.35 MB
-
Electricians prepping conduit for installation. (CS179, 02-18-2019) (46262522635).jpg 3,024 × 4,032; 2.98 MB
-
Excavation for a trench box west of Queens Boulevard. (CQ033, 08-16-2018) (44048208672).jpg 1,512 × 2,016; 1.13 MB
-
Installing a manhole east of Queens Blvd. (CQ033, 06-25-2018) (42185673165).jpg 2,016 × 1,512; 1.11 MB
-
Installing a retaining wall in the future Mid-Day Storage Yard. 08-26-2019 (48647690966).jpg 1,512 × 2,016; 1.21 MB
-
Installing a switch panel in Harold Interlocking. (ESA LIRR, 08-10-2018) (42287723550).jpg 2,988 × 1,968; 1.03 MB
-
Installing filter fabric in a 30 X 16 signal trough. (CQ033, 10-30-2018) (30742929057).jpg 3,024 × 4,032; 4.26 MB
-
New Main Line 4 Track (FHL02, 4-23-2018) (27324271687).jpg 2,782 × 2,004; 1.28 MB
-
Placing the stone bed for a 30 x 16 signal trough. (CQ033, 10-30-2018) (44958819454).jpg 3,024 × 4,032; 3.43 MB
-
Pulling of wire to pull box and signal hut. (FHA02, 4-13-2018) (39620887100).jpg 2,588 × 1,867; 1.2 MB
-
Replacement of inner ducts at Plaza Facilities (CS179, 5-21-18) (41776879474).jpg 4,608 × 3,456; 3.81 MB
-
Sub-ballast installed east of Queens Boulevard. (06-10-2019) (48062639838).jpg 2,016 × 1,512; 1.03 MB