Category:Guangzhou-Shenzhen Railway
Jump to navigation
Jump to search
railway line in People's Republic of China | |||||
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Location | Guangdong, PRC | ||||
Owned by | |||||
Operator |
| ||||
Date of official opening |
| ||||
Length |
| ||||
Terminus | |||||
| |||||
Subcategories
This category has the following 24 subcategories, out of 24 total.
*
- Shejichang level crossing (16 F)
C
- Chashan Railway Station (4 F)
D
G
L
- Lilang Railway Station (2 F)
P
- Pinghunan Railway Station (2 F)
S
- Shipai Railway Station (28 F)
- Shitan Railway Station (7 F)
- Sungang Railway Station (40 F)
T
- Tangtouxia Railway Station (6 F)
- Tianhedong Railway Station (11 F)
- Tiantangwei Railway Station (3 F)
- Tutang Railway Station (3 F)
X
- Xiancun Railway Station (6 F)
- Xiayuan Railway Station (8 F)
Z
- Zhangmutou Railway Station (7 F)
Media in category "Guangzhou-Shenzhen Railway"
The following 103 files are in this category, out of 103 total.
-
201609 Guangyuan express near Shougouling.jpg 4,912 × 3,264; 3.84 MB
-
201609 Jiefang Road North under Guangzhou–Shenzhen Railway.jpg 4,912 × 3,264; 3.63 MB
-
201609 Tianshou Road under Guangzhou–Shenzhen Railway in Linhe.jpg 4,912 × 3,264; 4.28 MB
-
201609 Tracks of Beijing–Kowloon Railway for Beijingxi Direction in Tutang.jpg 4,912 × 3,264; 3.28 MB
-
201704 C7076 information board.jpg 4,608 × 3,456; 3.64 MB
-
201704 CRH1A-A-1236 at Guangzhou East Station.jpg 4,608 × 3,456; 3.93 MB
-
20190331 155212 A.jpg 5,472 × 3,648; 9.73 MB
-
20190331 155819 A.jpg 5,472 × 3,648; 11.39 MB
-
20190331 160215 A.jpg 5,472 × 3,648; 6.37 MB
-
20190331 161359 A.jpg 5,472 × 3,648; 10.56 MB
-
20210421 IMG 7308.jpg 4,032 × 3,024; 3.59 MB
-
202403 Tangxia Hub Area of Guangzhou-Shenzhen Railway and Beijing-HK HSR.jpg 5,712 × 4,284; 4.19 MB
-
2024CRH6A4133C9417.jpeg 3,616 × 3,011; 2.34 MB
-
2024CRH6A4133C9418 17 42 32 269000.jpeg 3,826 × 2,858; 3.02 MB
-
2024CRH6A4133C9418.jpeg 4,032 × 3,024; 3.57 MB
-
4th line of Guangshen Railway in construction.jpg 800 × 600; 136 KB
-
Black Pepper Beefsteak and Prickly Ash Fish Fillets set meal on C7076 (20190419133002).jpg 4,032 × 2,688; 5.27 MB
-
C8070atGuangZhou.jpeg 2,048 × 1,536; 376 KB
-
C8070GZ CRH6A 13 52 45 796000.jpeg 1,695 × 1,385; 572 KB
-
C8070GZ CRH6A.jpeg 1,695 × 1,385; 489 KB
-
C8082atSZ.jpeg 2,048 × 1,536; 251 KB
-
C8082CRH6A.jpeg 2,048 × 1,536; 383 KB
-
C9418inSZ.jpeg 1,012 × 1,598; 405 KB
-
C9418inSZ2.jpeg 488 × 1,354; 154 KB
-
Canton Shamchun railway links map.png 10,000 × 8,000; 7.95 MB
-
China 2012 Guangzhou (8359561640).jpg 4,288 × 2,848; 5.04 MB
-
China Railways CRH1 2nd class interior.JPG 2,048 × 1,536; 521 KB
-
China Railways CRH1 at Zhangmutou.jpg 1,024 × 768; 397 KB
-
China Railways CRH1-003A at Shenzhen Railway Station (December 2006).jpg 1,280 × 960; 651 KB
-
China Railways DF4D 3046 on Guangshen Railway 20080621.jpg 2,000 × 1,333; 1.35 MB
-
China Railways DF5D.jpg 1,250 × 833; 945 KB
-
China Railways DJJ1.jpg 3,888 × 2,592; 1.09 MB
-
China Railways SS9G 0158.jpg 1,200 × 800; 1.42 MB
-
China-Railway-Ticket-Paper-IC.jpg 4,205 × 2,877; 2.09 MB
-
CR400BF-Z For Guangzhou-shenzhen 20231122.jpg 6,000 × 4,000; 14.18 MB
-
CRH Ticket.JPG 2,048 × 1,536; 891 KB
-
CRH1A For Guangzhou-shenzhen 20231122 Part 1.jpg 6,000 × 4,000; 12.36 MB
-
CRH1A For Guangzhou-shenzhen 20231122 Part 2.jpg 6,000 × 4,000; 11.94 MB
-
CRH1A in Guangzhou.JPG 3,105 × 2,056; 1.05 MB
-
CRH1A in Shenzhen.jpg 1,600 × 1,067; 1,017 KB
-
CRH1A-1010 at Guiyuan (20160813121527).jpg 4,000 × 2,664; 6.61 MB
-
CRH1A-1012 at Guiyuan (20160813120340).jpg 4,000 × 2,664; 6.87 MB
-
CRH1A-1106 经过广园快速路 20190331 155225.jpg 5,472 × 3,648; 9.55 MB
-
CRH6A at Guangzhou-Shenzhen Rail Line 2018 03.jpg 6,000 × 4,000; 13.13 MB
-
CRH6A(GSR Custom) at Guangzhou-Shenzhen Rail Line 2019 04.jpg 6,000 × 4,000; 13.99 MB
-
D7497GZD.jpeg 4,032 × 3,024; 3.38 MB
-
D7497GZD2.jpeg 3,939 × 3,024; 3.14 MB
-
D7497useCR200J.jpeg 4,032 × 3,024; 3.24 MB
-
D7498SZD.jpeg 4,032 × 3,024; 3.31 MB
-
D7498SZD2.jpeg 3,772 × 3,015; 2.96 MB
-
D9757GZD2.jpeg 3,565 × 2,817; 2.44 MB
-
D9795GZD.jpeg 4,032 × 3,024; 3.57 MB
-
DailyRegShenzhen.jpeg 4,032 × 3,024; 3.65 MB
-
DF11 0005 at Guiyuan (20160813131111).jpg 4,000 × 2,664; 8 MB
-
DF11 0005 at Guiyuan (20160813131119).jpg 3,874 × 2,472; 6.27 MB
-
DF11 0005 near Shenzhen Guest House (20160813115428).jpg 4,000 × 2,664; 6.74 MB
-
DF11-0396.jpg 1,024 × 768; 359 KB
-
File-Monitor in GZ East Railway Station District 3.JPG 3,968 × 2,976; 3.25 MB
-
G6554 for CR300AF-1001.jpg 6,000 × 4,000; 11.49 MB
-
Guangshen Railway (Shenzhen section).jpg 1,024 × 768; 852 KB
-
Guangshen Railway 20130218.jpg 3,005 × 2,003; 1.99 MB
-
Guangshen Railway 20210902-01.jpg 3,120 × 4,160; 4.63 MB
-
Guangshen Railway 20210902-02.jpg 3,120 × 4,160; 3.71 MB
-
Guangshen Railway Co Ltd building.jpg 1,200 × 1,600; 969 KB
-
Guangshen Railway map.png 897 × 850; 158 KB
-
Guangshen Railway on Baohanzhijie 20210902-01.jpg 3,120 × 4,160; 4.16 MB
-
GuangShen railway.png 300 × 300; 6 KB
-
Guangzhou East Railway Station CRH Automatic Tickets.JPG 1,981 × 1,228; 500 KB
-
Guangzhou-Shenzhen Railway in Guangzhou Yuexiu 20220517-01.jpg 3,120 × 4,160; 3.02 MB
-
Guangzhou-Shenzhen Railway in Guangzhou Yuexiu 20220517-02.jpg 3,120 × 4,160; 4.95 MB
-
Guangzhou-Shenzhen Railway in Guangzhou Yuexiu Xiaobei 20220302-01.jpg 3,120 × 4,160; 3.63 MB
-
Guangzhou-Shenzhen Railway in Guangzhou Yuexiu Xiaobei 20220302-02.jpg 4,160 × 3,120; 3.62 MB
-
Humen-Xiegang Expressway near West Zhangmutou Interchange.jpg 3,264 × 2,448; 1.75 MB
-
HXD1C拉敞车经过广园快速路人行天桥 20190331 155519.jpg 5,472 × 3,648; 9.56 MB
-
IC ticket of Guangshen Railway.jpg 800 × 532; 381 KB
-
K9084 approaching Guangzhou Railway Station (8744707104).jpg 4,391 × 2,927; 3.5 MB
-
MTR Freight Train at Shenzhen.jpg 1,024 × 768; 223 KB
-
Passenger traffic of Guangshen Railway 1979-1998.png 1,024 × 768; 20 KB
-
Rail ticket from Shenzhen to Guangzhou.JPG 2,048 × 1,536; 782 KB
-
Railway in guangzhou.JPG 1,632 × 1,224; 295 KB
-
SHENZHEN RIVER(72).jpg 8,192 × 5,464; 14.59 MB
-
SS8 0192 passing Guiyuan (20160813125642).jpg 4,000 × 2,664; 8.62 MB
-
SS8 0192 passing Guiyuan (20160813125645).jpg 4,000 × 2,664; 8.54 MB
-
SS8 0192 passing Guiyuan (20160813125654).jpg 4,000 × 2,664; 7.98 MB
-
SS8 0209 passing Guiyuan (20160813125227).jpg 4,000 × 2,664; 7.46 MB
-
SS8 0209 passing Guiyuan (20160813125232).jpg 4,000 × 2,664; 7.2 MB
-
SS8 K1208 深圳东到昆明拍摄于广园快速路人行天桥 20190331 161020.jpg 5,472 × 3,648; 9.66 MB
-
SS9GandT99.JPG 1,704 × 2,272; 1.92 MB
-
TLN 001 at Guiyuan (20160813120308).jpg 4,000 × 2,664; 6.68 MB
-
Waiting room for Guangzhou-Shenzhen intercity trains at Shenzhen railway station.jpg 4,080 × 3,060; 3.65 MB
-
Xinshisu.jpg 1,440 × 960; 1.38 MB
-
YW25 663762 at Guiyuan (20160813121802).jpg 4,000 × 2,664; 7.16 MB
-
YW25 663762 at Guiyuan (20160813121806).jpg 4,000 × 2,664; 5.88 MB
-
YZ25G 030578 at Guiyuan (20160813121816).jpg 4,000 × 2,664; 9.44 MB
-
Z823 leaving Guiyuan (20160813120333).jpg 4,000 × 2,664; 5.92 MB
-
ZY interiors in CRH6A(GSR Custom).jpg 4,000 × 3,000; 2.13 MB
-
广园快速路人行天桥上拍车 20190331 154735.jpg 5,472 × 3,648; 11.03 MB
-
广园快速路人行天桥上拍车 20190331 154737.jpg 5,472 × 3,648; 11.22 MB
-
广深公司的SS8-0001仍在正常运用中.jpg 4,592 × 2,583; 7.48 MB
-
广深准高速列车水牌.JPG 5,472 × 3,648; 5.22 MB
-
广深铁路 T156-157、T155-158次列车.jpg 5,472 × 3,648; 9.84 MB
-
广深铁路 石龙镇 DJI 0592.jpg 4,000 × 3,000; 4.4 MB
-
广深铁路 石龙镇 DJI 0595.jpg 4,000 × 3,000; 4.59 MB