Commons:National Archives and Records Administration/Categorize/US National Archives series: Federal Aid Project Files, compiled 1919 - 1955

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

There is no need to edit this page to update the table once you have categorized a file. The bot updates the page approximately hourly and will write over any changes made by editors.

Category:US National Archives series: Federal Aid Project Files, compiled 1919 - 1955
No. File Categorized?
1 Looking south from north bank. At 9 am, Feb. 20, 1927, one hour after Pier "C" shirfted. Six trestle bents washed out... - NARA - 298243.tif ✓ Done
2 Placing connection of suspension cables to northwest main anchor. showing front log, rods, sling chains and plate... - NARA - 298244.tif ✓ Done
3 Hauling rock from the river bank to the cribbing at Tower C - NARA - 298245.tif ✓ Done
4 Image shows the force fo the high water on the corrugated sheet iron encasement of Tower C. The pressure was... - NARA - 298246.tif ✓ Done
5 Reinforcements placed on northwest main anchor. Showing front log, rods, and bearing plates. Note washout in front of... - NARA - 298247.tif ✓ Done
6 Concrete foundation of southeast leg Tower C, indicating damage to end of post. - NARA - 298248.tif
7 Placing fill and slope boards for protection of northwest main anchor. - NARA - 298249.tif ✓ Done
8 Excavation on southeast leg Tower C. Shoring is required in all excavation more than 6 feet deep. - NARA - 298250.tif ✓ Done
9 The crew, Marshall Fry, Claude Fry, Mose Fry, L.D. Blondell, Wm. Reives, E.E. Dunbar, Gene Fry, W.T. Reinhards, Jean... - NARA - 298251.tif ✓ Done
10 Looking northwest from south bank. Remaining north approach shows relative shift downstream of Pier "C". Water just... - NARA - 298242.tif ✓ Done
11 Forest Service Footbridge at Angess - NARA - 298252.tif ✓ Done
12 End of project station 245, Section 11. Connects with trestle to Waldport, Oregon. Dangerous crossing of logging road. - NARA - 298259.tif ✓ Done
13 Alsea Rier Crossing Station 60, Sec. 9 1-150 ft. Housed Howe truss and 1-50 ft. Housed pony Truss. Highwater line at... - NARA - 298257.tif ✓ Done
14 Widening fill Station 150 on Section 11. THis fill crosses Eckman Slough and photo taken about half tide. Note... - NARA - 298258.tif ✓ Done
15 Alsea River Bridge, Station 60, Section 9. Looking through spans from South end. Shows stiff construction and well... - NARA - 298255.tif ✓ Done
16 Station 135 - Sec. 11. Small revolving shovel loading into trucks for Eckman Slough Fill. Was very expensive piece of... - NARA - 298254.tif
17 Station 150 - Section 11. Echman Slough showing brush mat used under fills crossing soft mud tide flats. - NARA - 298256.tif
18 Looking south from north bank. At 9 am, Feb. 20, 1927, one hour after Pier "C" shirfted. Six trestle bents washed out... - NARA - 298243.jpg ✓ Done
19 Placing connection of suspension cables to northwest main anchor. showing front log, rods, sling chains and plate... - NARA - 298244.jpg ✓ Done
20 Hauling rock from the river bank to the cribbing at Tower C - NARA - 298245.jpg ✓ Done
21 Image shows the force fo the high water on the corrugated sheet iron encasement of Tower C. The pressure was... - NARA - 298246.jpg
22 Reinforcements placed on northwest main anchor. Showing front log, rods, and bearing plates. Note washout in front of... - NARA - 298247.jpg
23 Concrete foundation of southeast leg Tower C, indicating damage to end of post. - NARA - 298248.jpg
24 Placing fill and slope boards for protection of northwest main anchor. - NARA - 298249.jpg
25 Excavation on southeast leg Tower C. Shoring is required in all excavation more than 6 feet deep. - NARA - 298250.jpg
26 The crew, Marshall Fry, Claude Fry, Mose Fry, L.D. Blondell, Wm. Reives, E.E. Dunbar, Gene Fry, W.T. Reinhards, Jean... - NARA - 298251.jpg ✓ Done
27 Looking northwest from south bank. Remaining north approach shows relative shift downstream of Pier "C". Water just... - NARA - 298242.jpg ✓ Done
28 Forest Service Footbridge at Angess - NARA - 298252.jpg ✓ Done
29 End of project station 245, Section 11. Connects with trestle to Waldport, Oregon. Dangerous crossing of logging road. - NARA - 298259.jpg
30 Alsea Rier Crossing Station 60, Sec. 9 1-150 ft. Housed Howe truss and 1-50 ft. Housed pony Truss. Highwater line at... - NARA - 298257.jpg ✓ Done
31 Widening fill Station 150 on Section 11. THis fill crosses Eckman Slough and photo taken about half tide. Note... - NARA - 298258.jpg ✓ Done
32 Alsea River Bridge, Station 60, Section 9. Looking through spans from South end. Shows stiff construction and well... - NARA - 298255.jpg
33 Station 135 - Sec. 11. Small revolving shovel loading into trucks for Eckman Slough Fill. Was very expensive piece of... - NARA - 298254.jpg
34 Station 150 - Section 11. Echman Slough showing brush mat used under fills crossing soft mud tide flats. - NARA - 298256.jpg