File:Step 1- Construction of the two side walls (5013684819).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,272 × 1,704 pixels, file size: 1.39 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: The armouring irons are connected and placed in the forms where they will be integrated in the concrete walls. The four armouring irons that come out of each side wall will serve in step 2 and 3 to put together these two side walls (left side an right side). The battens can be fixed in different ways with a rope only.
Date
Source https://www.flickr.com/photos/gtzecosan/5013684819/
Author SuSanA Secretariat
Permission
(Reusing this file)
The Sustainable Sanitation Alliance (SuSanA) is a network formed by organisations active in the field of sustainable sanitation.

The secretariat is currently located at Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ, German Agency for International Cooperation) in Eschborn, Germany.

Flickr sets
InfoField
Burkina Faso - construction of a very low budget urine diverting toilet (sitting position) Ecosan ARA
Flickr tags
InfoField
ecosan; Burkina Faso; Ecosan ARA; construction; UDDT; box; concrete box

Licensing[edit]

w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Sustainable sanitation at https://www.flickr.com/photos/23116228@N07/5013684819. It was reviewed on 1 November 2014 by FlickreviewR and was confirmed to be licensed under the terms of the cc-by-2.0.

1 November 2014

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:05, 1 November 2014Thumbnail for version as of 06:05, 1 November 20142,272 × 1,704 (1.39 MB) (talk | contribs)== {{int:filedesc}} == {{information |description={{en|1=The armouring irons are connected and placed in the forms where they will be integrated in the concrete walls. The four armouring irons that come out of each side wall will serve in step 2 and 3...

There are no pages that use this file.

Metadata