File:US Navy 110803-N-CV877-123 Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200 ton.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,288 × 2,848 pixels, file size: 701 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: VIRGINIA BEACH, Va. (Aug. 3, 2011) Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200 ton Crawler crane. Active duty and reserve component Seabees assigned to Amphibious Construction Battalions (PHIBCB) 1 and 2 construct the elevated causeway at least one a year for training. (U.S. Navy photo by Mass Communication Specialist 3rd Class Jonathan Pankau/Released)
Date Taken on 3 August 2011
Source

This image was released by the United States Navy with the ID 110803-N-CV877-123 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author U.S. Navy photo by Mass Communication Specialist 3rd Class Jonathan Pankau

Licensing[edit]

Public domain
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:58, 18 August 2011Thumbnail for version as of 01:58, 18 August 20114,288 × 2,848 (701 KB)BotMultichillT (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=VIRGINIA BEACH, Va. (Aug. 3, 2011) Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200 ton Crawler crane. Active duty and reserve com

There are no pages that use this file.

Metadata