Category:Electrification of Caltrain
Jump to navigation
Jump to search
ongoing $1.9 billion project of the U.S. commuter railroad Caltrain: adds a positive train control system, electrifies the main line; transitions from diesel-electric locomotive powered trains to electric multiple units | |||||
Upload media | |||||
Instance of |
| ||||
---|---|---|---|---|---|
Operator | |||||
Budget |
| ||||
| |||||
Subcategories
This category has the following 4 subcategories, out of 4 total.
S
Media in category "Electrification of Caltrain"
The following 36 files are in this category, out of 36 total.
-
Bayshore station and PS2 from Candlestick Hill, March 2021.JPG 4,805 × 2,989; 2.98 MB
-
CalMod Logo.svg 174 × 41; 5 KB
-
Caltrain arriving at Palo Alto, February 2022.jpg 4,032 × 3,024; 2.01 MB
-
Caltrain electric infrastructure in Palo Alto.jpg 4,080 × 3,072; 3.49 MB
-
Caltrain Electrification Groundbreaking (35843566623).jpg 4,512 × 3,000; 4.26 MB
-
Caltrain Traction Paralleling Station at Sunnyvale.jpg 4,032 × 3,024; 3.77 MB
-
Catenary at Mountain View station, February 2022.jpg 4,032 × 3,024; 4.08 MB
-
Catenary bases north of Millbrae station, June 2018.JPG 5,184 × 3,888; 4.84 MB
-
Catenary hangers in Tunnel 2, February 2020.JPG 4,015 × 3,007; 1.68 MB
-
Catenary poles at San Bruno station, June 2018.JPG 5,184 × 3,888; 2.62 MB
-
Catenary structures at San Bruno station, July 2018.JPG 5,184 × 3,888; 2.59 MB
-
Catenary structures north of San Bruno station, July 2018.JPG 5,184 × 3,888; 2.98 MB
-
Construction of Switching Station 1, December 2020.jpg 4,032 × 3,024; 2.86 MB
-
Flatcar with excavator for Caltrain electrification, August 2018.JPG 5,184 × 3,888; 8.6 MB
-
Inbound train passing through San Bruno station, July 2018.JPG 5,184 × 3,888; 2.4 MB
-
Palo Alto platform looking southeast February 2022.jpg 4,032 × 3,024; 4.02 MB
-
Paralleling Station 1 under construction, February 2021.jpg 4,032 × 3,024; 3.66 MB
-
Paralleling Station 1 under construction, July 2023.jpg 4,032 × 3,024; 4.35 MB
-
Paralleling Station 4 construction, December 2020.jpg 4,032 × 3,024; 3.39 MB
-
Paralleling Station 7 under construction, October 2021.jpg 4,032 × 3,024; 5.53 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 2.jpg 4,032 × 3,024; 4.15 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 3.jpg 3,024 × 4,032; 4.62 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 4.jpg 4,032 × 3,024; 4.47 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 5.jpg 4,032 × 3,024; 4.84 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 6.jpg 3,024 × 4,032; 4.72 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara 7.jpg 4,032 × 3,024; 4.96 MB
-
Peninsula Corridor, Lafayette overpass, Santa Clara.jpg 4,032 × 3,024; 3.85 MB
-
San Bruno Caltrain station platform, June 2018.JPG 5,184 × 3,888; 3.61 MB
-
Santa Clara station.jpg 4,032 × 3,024; 4.01 MB
-
Southbound platform at San Bruno Caltrain station, June 2018.JPG 5,184 × 3,888; 4.86 MB
-
StatewideRailMod BubbleMap 013013.jpg 2,550 × 3,301; 482 KB
-
West side of San Bruno Caltrain station, June 2018.JPG 5,184 × 3,462; 2.98 MB
-
Work equipment for Caltrain electrification, August 2018.JPG 5,184 × 3,461; 4.62 MB