File:0422 Grand Canyon South Entrance Roadwork (4927909217).jpg
Original file (3,000 × 2,000 pixels, file size: 1.04 MB, MIME type: image/jpeg)
Captions
Summary
[edit]Description0422 Grand Canyon South Entrance Roadwork (4927909217).jpg |
South Entrance Road chip sealing work, August 25, 2010, Grand Canyon National Park South Rim. NPS photo by Michael Quinn . . Project: Perform Preservation Treatment on approximately 130 Miles of Roads. . Project overview: This project involves crack sealing, chip sealing, and restriping most of the paved roads on the North and South Rims of Grand Canyon National Park. Paved road surfaces should receive a pavement treatment on an approximately seven-year cycle to sustain the integrity of the road surface and increase the roadway’s life span. This sealcoat will assure at least seven or more years of service without having to reconstruct the sub base and resurface the asphalt. |
Date | |
Source | 0422 Grand Canyon_South Entrance Roadwork |
Author | Grand Canyon National Park |
Licensing
[edit]- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Grand Canyon NPS at https://flickr.com/photos/50693818@N08/4927909217. It was reviewed on 20 April 2020 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
20 April 2020
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 18:45, 20 April 2020 | 3,000 × 2,000 (1.04 MB) | Killarnee (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | South Entrance Road chip sealing work, August 25, 2010, Grand Canyon National Park South Rim. NPS photo by Michael Quinn
Project: Perform Preservation Treatment on approximately 130 Miles of Roads Project overview: This project involves crack sealing, chip sealing, and restriping most of the paved roads on the North and South Rims of Grand Canyon National Park. Paved road surfaces should receive a pavement treatment on an approximately seven-year cycle to sustain the integrity of the road surface and increase the roadway’s life span. This sealcoat will assure at least seven or more years of service without having to reconstruct the sub base and resurface the asphalt. |
---|---|
IIM version | 2 |