File:Bruce Freeman Trail Event, Lt. Governor Murray, June 18, 2010 (4711657665).jpg
Original file (3,264 × 1,952 pixels, file size: 3.24 MB, MIME type: image/jpeg)
Captions
Summary[edit]
DescriptionBruce Freeman Trail Event, Lt. Governor Murray, June 18, 2010 (4711657665).jpg |
Lieutenant Governor Timothy Murray today announced funding to design a major expansion of the popular Bruce Freeman Rail Trail through Westford, Carlisle, Acton and Concord. The $931,500 in capital funds will design the next two phases of the Freeman Rail Trail, the first of which will extend the trail south by nearly five miles. "This strategic investment in designing the expansion of the Freeman Trail will enhance the transportation and recreational infrastructure in the region, providing long term healthy transportation benefits to the residents of Acton, Westford, Carlisle and the many people in the surrounding communities who use and enjoy the Trail," said Governor Deval Patrick. "As part of our administration's transportation reform we have committed to improve service within all transportation systems in the Commonwealth," said Lieutenant Governor Timothy Murray. "Today's announced design funding for the expansion of the Bruce Freeman Rail Trail is another example of infrastructure improvements that will offer our residents increased recreational and healthy transportation opportunities in the region." The funds will design the next two phases of the Bruce Freeman Rail Trail from the end of the current trail through Westford and Lowell south through Westford, Carlisle, Acton and Concord, including construction of a 10-12 foot paved asphalt multi-use trail, construction of a pedestrian bridge over Route 2A/119, and rehabilitation of six existing rail bridges along the Trail. A segment of the trail crossing Route 2 will be designed with the Concord Rotary Project. In October 2009, the Patrick Administration awarded an additional $500,000 in "Transportation Enhancements" funding to support final design of phase 2A of the Bruce Freeman Rail Trail. The estimated construction cost of the first phase of Trail expansion through Acton, Westford, and Carlisle is $7.7 million. Learn more about Governor Patrick's Massachusetts Works programs to create jobs and promote economic development. |
Date | |
Source | Bruce Freeman Trail Event, Lt. Governor Murray, June 18, 2010 |
Author | MassDOT |
Licensing[edit]
Public domainPublic domainfalsefalse |
This work is in the public domain in the United States because it was a Commonwealth of Massachusetts public record disseminated by a Commonwealth agency or the Massachusetts Archives. Massachusetts' Secretary of the Commonwealth has stated that such works can be copied and used for any purpose. This copyright does not extend to those records created, received, or under the custody of municipalities by M. G. L. c. 66, § 7, unless otherwise stated, nor does this apply to copy-written materials for commercial purposes received by employees of the Commonwealth.
Language describing permissions
A Guide to the Massachusetts Public Records Law, Published by William Francis Galvin, Secretary of the Commonwealth Division of Public Records, (Updated January 2017) can be found at https://www.mass.gov/files/2017-06/Public%20Records%20Law.pdf and page 7 says:
Definition of "public record"
Public records are defined in A Guide to the Massachusetts Public Records Law, Published by William Francis Galvin, Secretary of the Commonwealth Division of Public Records, (Updated January 2017) at https://www.mass.gov/files/2017-06/Public%20Records%20Law.pdf on page 40, under M. G. L. c. 4, § 7(26) as:
Limitations of template usage
This is consistent with the statement at http://www.sec.state.ma.us/ARC/arcres/residx.htm:
Note: Works that are considered "public records" but were not created by a state or municipal government agency may be copyrighted by their author; the Supremacy Clause of the United States Constitution prevents state law from overriding the author's right to copyright protection that is granted by federal law. For example, a state agency may post images online of the final appearance of a building under construction; while the images may be "public records", their creator (eg. architecture/construction firm) retains copyright rights to the image unless the contract with the agency says otherwise. See: Government-in-the-Sunshine Manual: To what extent does federal law preempt state law regarding public inspection of records?. |
This image was originally posted to Flickr by MassDOT at https://flickr.com/photos/42009447@N05/4711657665 (archive). It was reviewed on 22 November 2019 by FlickreviewR 2 and was confirmed to be licensed under the terms of the Public Domain Mark. |
22 November 2019
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 16:45, 19 June 2018 | 3,264 × 1,952 (3.24 MB) | Ser Amantio di Nicolao (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | HTC |
---|---|
Camera model | ADR6300 |
ISO speed rating | 100 |
Date and time of data generation | 12:39, 18 June 2010 |
Horizontal resolution | 72 dpi |
Vertical resolution | 72 dpi |
Y and C positioning | Centered |
Exif version | 2.2 |
Date and time of digitizing | 12:39, 18 June 2010 |
Meaning of each component |
|
Supported Flashpix version | 1 |
Color space | sRGB |