File:SLS Intertank structure moving down the factory floor.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,000 × 1,335 pixels, file size: 698 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Engineers assembled the structure of the intertank that will be flown on the first Space Launch System integrated flight with Orion. The intertank, one of five parts of the 212-foot core stage being built and assembled at NASA's Michoud Assembly Facility in New Orleans, is on its way to undergo the application of thermal protection systems. The intertank is the only major structural part of the core stage that is not welded. It is made of eight large panels which are connected with 7,500 bolts. The 22-foot-tall structure carries most of the massive launch load produced by the solid rocket boosters that separate from the core stage about two minutes after launch.
Date Taken on 10 June 2017, 16:04
Source https://www.nasa.gov/exploration/systems/sls/core-stage-production-continues-for-rockets-first-flight (direct link)
Author NASA/MSFC Michoud image: Judy Guidry

Licensing[edit]

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:41, 7 August 2018Thumbnail for version as of 15:41, 7 August 20182,000 × 1,335 (698 KB)Ras67 (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Engineers assembled the structure of the intertank that will be flown on the first Space Launch System integrated flight with Orion. The intertank, one of five parts of the 212-foot core stage being built and assembled at NASA's Michoud Assembly Facility in New Orleans, is on its way to undergo the application of thermal protection systems. The intertank is the only major structural part of the core stage that is not welded. It is made...

Metadata