File:KSC-05-S-00306 (ksc 110405 sssr).webm

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

KSC-05-S-00306_(ksc_110405_sssr).webm(WebM audio/video file, VP9/Opus, length 3 min 4 s, 320 × 212 pixels, 365 kbps overall, file size: 8.01 MB)

Captions

Captions

Next on the NASA Space Shuttle Status Report: All three of NASA's orbiters are preparing for missions to the International Space Station.

Summary[edit]

Description
English: Next on the NASA Space Shuttle Status Report: All three of NASA's orbiters are preparing for missions to the International Space Station. Discovery gets new wheels_ Atlantis is undergoing an underside inspection, and Endeavour is taking shape_ The NASA Space Shuttle Status Report starts right now. I'm Bob Walker, NASA test director, and this is the NASA Space Shuttle Status Report. Topping NASA's orbiter news this week: Inside Orbiter Processing Facility bay 3 at the Kennedy Space Center in Florida, orbiter Discovery is getting ready for its second return to flight test mission, named STS-121. Post-flight inspections of the thermal protective tiles that cover the underside of the orbiter are now in progress, as well as power-up testing on the vehicle systems. Technicians also installed new tires on Discovery's landing gear. Work on orbiter Atlantis is moving right along. Gap filler work and other processing continues inside Orbiter Processing Facility bay 1 at Kennedy. The vehicle is preparing to fly mission STS-115 to the International Space Station. Right now, workers are intensely checking, inspecting and installing gap fillers between the orbiter's thermal protective tiles. Gap fillers are placed between the thousands of tiles to provide additional thermal protection during reentry. Extra focus will be placed on this area after two pieces of gap filler wiggled loose during STS-114, Discovery's return-to-flight mission in July. In an unprecedented spacewalk, astronaut Steve Robinson plucked the dislodged filler from between the tiles to ensure a safe return for Discovery and its crew. As part of mission STS 115, Atlantis will transport important truss segments to the International Space Station. The P3_P4 truss segments are currently being prepped at Kennedy's Space Station Processing Facility. Solar arrays are attached to the P3_P4 trusses and will provide 25 percent of the power generation capability of the space station. And orbiter Endeavour continues processing in Orbiter Processing Facility bay two after a nearly two-year major modification period. Endeavour's body flap hardware has been reattached following extensive modification work. While the body flap was removed, technicians sanded and painted the hardware with corrosion control paint. That’s all the time we have for this week’s Space Shuttle Status Report. Stay with NASA TV and nasa.gov for the latest in mission news. For the NASA Space Shuttle Status Report, I'm Bob Walker.
Date Taken on 10 November 2005
Source
This image or video was catalogued by Kennedy Space Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: ksc_110405_sssr.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.
Other languages:
Author NASA Kennedy Space Center
Keywords
InfoField
atlantis; OV-105; OV-104; preparations; OV-103; tiles; prelaunch; discovery; TPS; tile; processing; endeavour; space_shuttle

Licensing[edit]

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:52, 10 May 20243 min 4 s, 320 × 212 (8.01 MB)OptimusPrimeBot (talk | contribs)Imported media from http://images-assets.nasa.gov/video/ksc_110405_sssr/ksc_110405_sssr~orig.mp4

The following page uses this file:

Transcode status

Update transcode status
Format Bitrate Download Status Encode time
VP9 240P 244 kbps Completed 02:17, 10 May 2024 54 s
Streaming 240p (VP9) 139 kbps Completed 02:17, 10 May 2024 53 s
WebM 360P 459 kbps Completed 02:17, 10 May 2024 22 s
Streaming 144p (MJPEG) 654 kbps Completed 02:16, 10 May 2024 3.0 s
Stereo (Opus) 86 kbps Completed 02:17, 10 May 2024 3.0 s
Stereo (MP3) 128 kbps Completed 02:17, 10 May 2024 5.0 s

Metadata