Category:Biogas digesters under construction
Jump to navigation
Jump to search
Media in category "Biogas digesters under construction"
The following 181 files are in this category, out of 181 total.
-
7.Naivasha construction (4426404635).jpg 640 × 480; 210 KB
-
8.Naivasha construction (4427167662).jpg 640 × 360; 120 KB
-
Armature en bois de soutien et de fixation.jpg 2,448 × 3,264; 2.74 MB
-
Backfilling of dome and other finishes (5363269103).jpg 2,576 × 1,932; 1.26 MB
-
Biogas construction in cantonment (4971874669).jpg 1,049 × 700; 129 KB
-
Biogas digester and earth construction work (3483399764).jpg 3,072 × 2,304; 2.67 MB
-
Biogas digester and earth construction work (3483402498).jpg 2,816 × 2,112; 2.38 MB
-
Block for the dome construction were made on-site (5363263975).jpg 2,576 × 1,932; 1.26 MB
-
Building the digester.jpg 1,500 × 980; 592 KB
-
Casting of bio-digester slab with ring reinforcement (5363877450).jpg 2,576 × 1,932; 1.26 MB
-
Casting of lids for expansion chamber (5363882130).jpg 1,932 × 2,576; 1.62 MB
-
Checking gas tightness of main valve and fittings (5363271397).jpg 640 × 480; 131 KB
-
Clueing of pipes (5363270803).jpg 1,932 × 2,576; 926 KB
-
Collage du manchon sur la bouche principale de la cuve.JPG 5,184 × 3,456; 4.9 MB
-
Construction in progress (5324342906).jpg 2,592 × 1,944; 914 KB
-
Construction of biogas digester (4834104234).jpg 2,592 × 1,944; 1.95 MB
-
Construction of bottom outlet chamber (5363880778).jpg 1,224 × 1,632; 800 KB
-
Construction of digester (underground) (4834090218).jpg 2,592 × 1,944; 1.87 MB
-
Construction of water trap manhole (5363883592).jpg 640 × 480; 130 KB
-
Cutting of PVC 1,5" pipes, Class C, with wire (5363270909).jpg 2,576 × 1,932; 1.22 MB
-
Delivery of materials to the construction side (5363265133).jpg 1,632 × 1,224; 918 KB
-
Desludging manhole (Bottom outlet) (5363271337).jpg 640 × 480; 131 KB
-
Detail of bottom outlet pipe (5363881100).jpg 1,632 × 1,224; 905 KB
-
Detail of water trap manhole (5363271469).jpg 640 × 480; 129 KB
-
Detail of wedging the lid of the neck (5363882568).jpg 1,932 × 2,576; 1.24 MB
-
Detail outlet pipe expansion chamber (5363267977).jpg 1,632 × 1,224; 935 KB
-
Digester construction (4833523433).jpg 2,592 × 1,944; 1.79 MB
-
Digester construction (4833566577).jpg 2,592 × 1,944; 1.79 MB
-
Digester construction (4833580283).jpg 2,592 × 1,944; 1.85 MB
-
Digester construction (4834150910).jpg 2,592 × 1,944; 1.71 MB
-
Digester dome (4833661721).jpg 2,592 × 1,944; 1.63 MB
-
Digester dome construction (4833631219).jpg 2,592 × 1,944; 1.64 MB
-
Digesteur souss massa (9933718766).jpg 2,310 × 1,595; 991 KB
-
Digging of the pit for the bio-digester (5363415678).jpg 2,576 × 1,932; 1.26 MB
-
Digging of the pit for the bio-digester (5363416210).jpg 1,632 × 1,224; 916 KB
-
Digging the hole for the digester (4834074716).jpg 2,592 × 1,944; 1.79 MB
-
Dome of bio-digester under construction (5363265413).jpg 2,576 × 1,932; 1.24 MB
-
Downside of lids (5363268865).jpg 640 × 480; 132 KB
-
During construction (5363880966).jpg 1,632 × 1,224; 928 KB
-
During construction of expansion chambers (5363267897).jpg 1,632 × 1,224; 905 KB
-
During filling of biogas digester is filled with water (5363271005).jpg 640 × 480; 135 KB
-
Découpe du tuyau.JPG 5,184 × 3,456; 8.43 MB
-
Découpe du tuyaux à la bonne haueur.JPG 5,184 × 3,456; 6.06 MB
-
Emmanchement du tuyau d'admission déchets et préparation de la garde hydraulique.JPG 5,184 × 3,456; 5.88 MB
-
Entry point (stair case) from the expansion chambers into the bio-digester (5363879606).jpg 2,576 × 1,932; 1.24 MB
-
Etanchéification de la fixation du manchon sur le tuyau.jpg 2,448 × 3,264; 1.65 MB
-
Etanchéification des conduites (1).jpg 2,448 × 3,264; 2.93 MB
-
Etanchéification des conduites (2).jpg 2,448 × 3,264; 3.01 MB
-
Excavations for a biogas digester in Libuyu (6593070211).jpg 1,824 × 1,368; 1.29 MB
-
Expansion chamber construction (4834226258).jpg 2,592 × 1,944; 1.79 MB
-
Expansion chamber construction and outlet pipe finishing (4833595181).jpg 2,592 × 1,944; 1.76 MB
-
Expansion chambers with effluent pipe (5363882660).jpg 1,632 × 1,224; 907 KB
-
Facture Briconaute (3).jpg 2,448 × 3,264; 2.05 MB
-
Feeding pipe into the bio-digester (5363879954).jpg 2,576 × 1,932; 1.25 MB
-
Finished neck construction with biogas pipe and pipes for wedging (5363269233).jpg 2,576 × 1,932; 1.23 MB
-
First layers of stones are laid (5363264965).jpg 1,632 × 1,224; 823 KB
-
Fitting for piping PVC 1,5", Class C (5363882922).jpg 2,576 × 1,932; 1.2 MB
-
Fixation du manchon du le tuyau d'admission.jpg 2,448 × 3,264; 2.73 MB
-
Fixation du manchon sur la bouche principale de la cuve (1).JPG 3,264 × 2,448; 1.55 MB
-
Fixation du manchon.JPG 3,264 × 2,448; 1.86 MB
-
Fixation finale du manchon sur le tuyau.jpg 2,448 × 3,264; 2.04 MB
-
Fixing of the central pole and levels (5363416286).jpg 1,632 × 1,224; 920 KB
-
Flexible laiton.jpg 2,448 × 3,264; 1.63 MB
-
Garde hydraulique et son liquide de suivi de pression.jpg 2,448 × 3,264; 3.15 MB
-
Gonflage de la chambre de stockage de gaz.jpg 2,448 × 3,264; 2.5 MB
-
Graduation de la cuve pour niveau de mélange eau digestat minimum.jpg 2,448 × 3,264; 2.34 MB
-
Inlet chamber for bio-digester under construction (5363266553).jpg 640 × 480; 130 KB
-
Inlet chamber of bio-digester (5363882304).jpg 640 × 480; 132 KB
-
Inside the expansion chambers (5363267699).jpg 1,632 × 1,224; 860 KB
-
Installation du mamelon valve.jpg 2,448 × 3,264; 2.47 MB
-
Joint de serrage pour manchon de récupération de gaz.JPG 5,184 × 3,456; 4.7 MB
-
Klimaschutzprojekt-indien-7149-4.jpg 1,500 × 980; 270 KB
-
L'équipe autour du prototype v1 et présentation.JPG 3,264 × 2,448; 3.75 MB
-
Laying of stones with counterweight (5363877952).jpg 2,576 × 1,932; 1.25 MB
-
Local welder (Kagwe) (5363269359).jpg 1,932 × 2,576; 1.02 MB
-
Look into the expansion chamber (5363883786).jpg 640 × 480; 128 KB
-
Manchon de récupération du gaz monté.jpg 2,448 × 3,264; 2.01 MB
-
Manhole of digester (4833554599).jpg 2,592 × 1,944; 1.58 MB
-
Mason Mzee is one of the qualified staff from the construction company (5363267467).jpg 1,932 × 2,576; 1.14 MB
-
Matériel de prototypage (10).JPG 3,264 × 2,448; 4.07 MB
-
Matériel de prototypage (cuve, bidon et petit matériel).jpg 2,448 × 3,264; 3.64 MB
-
Matériel de prototypage (La cuve 1).jpg 2,448 × 3,264; 3.5 MB
-
Matériel de prototypage (La cuve 2).jpg 2,448 × 3,264; 3.56 MB
-
Matériel de prototypage (Pour le gaz).JPG 3,264 × 2,448; 4.04 MB
-
Matériel de prototypage 1.JPG 3,264 × 2,448; 1.53 MB
-
Matériel de prototypage 2.jpg 2,448 × 3,264; 1.76 MB
-
Matériel de prototypage 3.JPG 3,264 × 2,448; 1.79 MB
-
Matériel de prototypage 5.JPG 3,264 × 2,448; 1.83 MB
-
Matériel de prototypage 8.JPG 2,448 × 3,264; 2.35 MB
-
Matériel de prototypage 9.JPG 3,264 × 2,448; 2.89 MB
-
Matériel pour prototypage (11).jpg 2,448 × 3,264; 2.52 MB
-
Matériel pour prototypage (12).jpg 2,448 × 3,264; 4.76 MB
-
Matériel pour prototypage (15).jpg 2,448 × 3,264; 3.71 MB
-
Matériel pour prototypage 7.jpg 2,448 × 3,264; 2.12 MB
-
Matérill pour prototypage (14).jpg 2,448 × 3,264; 2.26 MB
-
Mixing of concrete (5363264713).jpg 2,576 × 1,932; 1.25 MB
-
Moment d'échange avec des acteurs locaux.JPG 5,184 × 3,456; 5.52 MB
-
Neck construction (5363880858).jpg 1,632 × 1,224; 863 KB
-
Nettoyage de la cuve no-tech.jpg 2,448 × 3,264; 2.27 MB
-
OMM Team and Proto.jpg 960 × 720; 136 KB
-
Piping work on the neck (5363882222).jpg 1,932 × 2,576; 1.33 MB
-
Placing the pipes in the dug trench (5363270595).jpg 1,932 × 2,576; 1.9 MB
-
Plan de découpe du plancher de poids d'evacuation du gaz.jpg 2,441 × 1,849; 1.05 MB
-
Plan de fonctionnement interne de la cuve.jpg 3,264 × 2,448; 1.81 MB
-
Plan de la bouche d'amission.jpg 3,264 × 2,448; 1.78 MB
-
Plan de la cuve.JPG 2,448 × 3,264; 1.62 MB
-
Pose du Téflon pour étanchéification des raccords.jpg 2,448 × 3,264; 1.91 MB
-
Positionnement du serre joint.JPG 3,264 × 2,448; 1.28 MB
-
Positionnement du tuyau d'admission des déchets.JPG 5,184 × 3,456; 5.73 MB
-
Preparation for casting of the slab (5363877270).jpg 2,576 × 1,932; 1.25 MB
-
Programme du jour.jpg 2,448 × 3,264; 2.08 MB
-
Prototype V1 Finalisé.jpg 2,448 × 3,264; 2.79 MB
-
Préparation de l'outillage nécessaire pour prototypage.JPG 3,264 × 2,448; 3.59 MB
-
Préparation de la chambre à air pour manchon étanche.jpg 2,448 × 3,264; 2.43 MB
-
Préparation du plancher de poids.jpg 2,448 × 3,264; 3.44 MB
-
Préparation pour étanchéification de la base du machon (1).JPG 5,184 × 3,456; 6.84 MB
-
Quelques soucis de fuites.JPG 3,264 × 2,448; 3.18 MB
-
Raccord du manchon de sortie de gaz.jpg 2,448 × 3,264; 2.25 MB
-
Raccord Vanne Manométrique Soupape Garde hydraulique.jpg 2,448 × 3,264; 2.75 MB
-
Raccord Vanne Manométrique Soupape Sortie de gaz depuis le manchon de récupération.jpg 2,448 × 3,264; 2.69 MB
-
Remplissage de la cuve d'eau.jpg 2,448 × 3,264; 2.54 MB
-
Ring-reinforcement of slab for bio-digester is set (5363264445).jpg 2,576 × 1,932; 1.26 MB
-
Réflexion sur le positionnement et la fixation de la garde hydraulique.JPG 5,184 × 3,456; 5.89 MB
-
Réparation du matériel récupéré sur place (ici une scie à métaux).JPG 5,184 × 3,456; 6.91 MB
-
Schéma de conception (Garde hydraulique).JPG 2,448 × 3,264; 1.86 MB
-
Schéma de conception (positionnement du tuyaux d'admission).JPG 2,448 × 3,264; 1.81 MB
-
Schéma de conception et plans (2).JPG 5,184 × 3,456; 5.82 MB
-
Schéma de conception et plans.JPG 5,184 × 3,456; 5.51 MB
-
Schéma de conception HT.jpg 1,597 × 897; 385 KB
-
Schéma de la cuve, choix inclinaison de l'admission.JPG 3,264 × 2,448; 1.9 MB
-
Schéma de principe de fonctionnement simplifié.jpg 2,981 × 2,089; 1.52 MB
-
Schéma simplifié du système.jpg 2,620 × 1,754; 1.09 MB
-
Sertissage du manchon et connexion.JPG 5,184 × 3,456; 6.38 MB
-
Silicone pour étanchéité à la base du manchon.JPG 5,184 × 3,456; 6.72 MB
-
Slap construction for expansion chamber (5363267597).jpg 2,576 × 1,932; 1.26 MB
-
Sticking the pipes together (5363883224).jpg 1,932 × 2,576; 1.12 MB
-
Stockage de gaz.jpg 2,448 × 3,264; 2.81 MB
-
Support de la garde hydraulique et Plancher de poids.jpg 2,448 × 3,264; 2.38 MB
-
Test avec retournement de la cuve.JPG 3,264 × 2,448; 3.86 MB
-
Test de gonflage et étanchéité du manchon.jpg 2,448 × 3,264; 2.56 MB
-
Test de l'ensemble du système par gonflage.JPG 3,264 × 2,448; 2.22 MB
-
Test de l'installation (1).jpg 2,448 × 3,264; 2.93 MB
-
Test de tenue en pression du système.jpg 2,448 × 3,264; 1.98 MB
-
Test du fonctionnement du mamelon valve.jpg 2,448 × 3,264; 2.21 MB
-
Test du mamelon valve.JPG 5,184 × 3,456; 5.88 MB
-
Test du sertissage de l'admission.JPG 3,264 × 2,448; 1.6 MB
-
Test perforation et étanchéité.jpg 2,448 × 3,264; 2.97 MB
-
The lid of the neck after casting and curing (5363269021).jpg 640 × 480; 131 KB
-
Tout est en place pour lancer le prototypage.JPG 5,184 × 3,456; 7.32 MB
-
Trou en croix.jpg 2,448 × 3,264; 2.45 MB
-
Tuyauterie.JPG 3,264 × 2,448; 1.94 MB
-
Tuyaux PVC.jpg 2,448 × 3,264; 2.8 MB
-
Téflon pour étanchéification des raccords.jpg 2,448 × 3,264; 1.8 MB
-
Un mamelon et rien ne va plus.jpg 2,448 × 3,264; 3 MB
-
V1 du prototyge.jpg 2,448 × 3,264; 2.49 MB
-
V1 Prototype avec équipe.JPG 3,264 × 2,448; 2.59 MB
-
Valve étanche.jpg 2,448 × 3,264; 1.87 MB
-
Vanne manométrique et tuyauterie.JPG 3,264 × 2,448; 2.2 MB
-
Vue du système dans son ensemble.JPG 3,264 × 2,448; 1.71 MB
-
Vue éclatée de la valve mamelon étanche.jpg 2,448 × 3,264; 1.61 MB
-
Vérification des dimensions du sur serre joint.JPG 5,184 × 3,456; 6.1 MB
-
Vérification du bon positionnement du manchon et du tuyau.JPG 5,184 × 3,456; 5.56 MB
-
Water trap is filled with water (5363272253).jpg 1,932 × 2,576; 1.25 MB