Category:Tunnel construction by method
Jump to navigation
Jump to search
Subcategories
This category has the following 4 subcategories, out of 4 total.
B
- Bottom-up method (Tunneling) (7 F)
C
- Compressed air tunneling (3 F)
- Cut-and-cover method (Tunneling) (17 F)