Category talk:Construction of Marilao station (Saog section), 12-2021

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

The Saog construction section is (beside or interconnects with Ibayo section, which surrounds SM Marilao) further divided into 2 Categories, namely a) Construction of Marilao station (MacArthur Highway, Saog), 12-2021 - that is, Barangay Saog along MacArthur Highway and b) Construction of Marilao station (Saog Centro), 12-2021 that is, from the Barangay Hall to terminus, Marilao Riverside - in Barangay Saog, Marilao. (Marilao station elevated railway structures viaduct 3 Level station at Km. 13+676, 190 meters platform Bulacan - PNR Clark Phase 1 (Malolos-Tutuban) Contract package 01 elevated structures, depot and 6 stations NSCR North (Tutuban–Malolos–Clark) "NSCR North, or PNR Clark, was divided into 2 phases. NSCR North 1 involves 21.2 Kms. Tutuban-Malolos segment 37.9 kms. North–South Commuter Railway Partial reactivation of North Caloocan Line - construction of embankment, bored pile foundation, span-by-span viaduct and PC box girder bridge; the elevated dual-track system is standard-gauge; viaduct of the piers - connected by the Span by Span with spans foundation works completed and Balanced Cantilever Construction Method using precast concrete box girders of 60 to70 tons each cast in Calumpit Yard; works upward for structural works with remaining launching gantries with a 50-meter span having started. Enmankment - reinforced -soil railway structure with rigid facing RRR, bored pile foundation, viaduct span-by-span, PC Box Girder Bridge).FBenjr123 (talk) 07:51, 26 December 2021 (UTC).[reply]