File:BurstCube Completes Thermal Vacuum Testing (SVS14489 - BurstCube ThermalVac 59 94 4k).webm

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(WebM audio/video file, VP8/Opus, length 8 min 31 s, 4,096 × 2,160 pixels, 2.6 Mbps overall, file size: 158.48 MB)

Captions

Captions

This video shows NASA engineers securing the BurstCube satellite in a thermal vacuum chamber for testing. The first shot shows a thermal vacuum chamber lab at NASA’s Goddard Space Flight Center in Greenbelt, Maryland.

Summary

[edit]
Description
English: This video shows NASA engineers securing the BurstCube satellite in a thermal vacuum chamber for testing. The first shot shows a thermal vacuum chamber lab at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. The second clip shows Julie Cox (NASA) and Seth Abramczyk (NASA) moving BurstCube, still in a clear protective case, from a table to the chamber platform. The next shot shows Cox and Abramczyk talking over the spacecraft, now without the covering. NASA engineers Franklin Robinson and Elliot Schwartz look on. In the fourth and fifth shots, all four engineers work to move BurstCube into position. In the sixth shot, Cox props one of the solar panels slightly open so they can test it when the spacecraft is in the chamber. In the next shot, Cox, Abramczyk, and Robinson make more adjustments. The eighth shot shows one side of BurstCube, which is engraved with the mission’s logo and the names of partner institutions. The following two clips show wider views of the spacecraft on the chamber platform. The eleventh shot shows Abramczyk and Cox typing at their computers. The twelfth shot shows a computer screen with a feed from a camera on the chamber platform. A smiling Abramczyk pops in and out of view. The thirteenth clip shows Cox deploying one solar panel with Abramczyk and Robinson in the background. The fourteenth shot shows Schwartz, Robinson, Abramczyk, and Colton Cohill (NASA) moving the top of the chamber into place. The fifteenth through nineteenth shots show the engineers steadying the lid as it lowers slowly into place. Shot twenty shows Schwartz securing the top of the lid. Shot twenty-one shows a pan of the sealed chamber. The final shot shows a data readout on a computer screen. Credit: NASA/Sophia Roberts
Date 18 December 2023 (upload date)
Source BurstCube Completes Thermal Vacuum Testing
Author NASA's Scientific Visualization Studio - Jeanette Kazmierczak, Sophia Roberts
Other versions

Licensing

[edit]
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current21:07, 9 January 20248 min 31 s, 4,096 × 2,160 (158.48 MB)OptimusPrimeBot (talk | contribs)#Spacemedia - Upload of https://svs.gsfc.nasa.gov/vis/a010000/a014400/a014489/BurstCube_ThermalVac_59.94_4k.webm via Commons:Spacemedia

There are no pages that use this file.

Transcode status

Update transcode status
Format Bitrate Download Status Encode time
VP9 2160P 12.84 Mbps Completed 23:08, 9 January 2024 1 h 57 min 50 s
Streaming 2160p (VP9) 12.84 Mbps Completed 22:52, 9 January 2024 1 h 41 min 7 s
VP9 1440P 6.45 Mbps Completed 22:06, 9 January 2024 55 min 50 s
Streaming 1440p (VP9) 6.45 Mbps Completed 21:56, 9 January 2024 45 min 24 s
VP9 1080P 3.69 Mbps Completed 21:55, 9 January 2024 44 min 58 s
Streaming 1080p (VP9) 3.69 Mbps Completed 21:41, 9 January 2024 32 min 20 s
VP9 720P 1.76 Mbps Completed 21:22, 9 January 2024 15 min 8 s
Streaming 720p (VP9) 1.76 Mbps Completed 21:22, 9 January 2024 14 min 56 s
VP9 480P 841 kbps Completed 21:25, 9 January 2024 12 min 55 s
Streaming 480p (VP9) 837 kbps Completed 21:23, 9 January 2024 11 min 14 s
VP9 360P 494 kbps Completed 21:19, 9 January 2024 9 min 48 s
Streaming 360p (VP9) 492 kbps Completed 21:15, 9 January 2024 6 min 39 s
VP9 240P 252 kbps Completed 21:15, 9 January 2024 8 min 4 s
Streaming 240p (VP9) 248 kbps Completed 21:13, 9 January 2024 6 min 21 s
WebM 360P 1.05 Mbps Completed 21:15, 9 January 2024 5 min 39 s
Streaming 144p (MJPEG) 1 Mbps Completed 21:09, 9 January 2024 1 min 50 s
Stereo (Opus) 1 kbps Completed 21:14, 9 January 2024 3.0 s
Stereo (MP3) 128 kbps Completed 21:14, 9 January 2024 5.0 s

Metadata