File:Medford Branch construction and Community Path connection, December 2021.JPG

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (5,184 × 3,888 pixels, file size: 9.08 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Medford Branch construction southeast of Lowell Street in December 2021. At right is the terminus of the 2015 extension of the Somerville Community Path, with the connection to the new extension.
Date Taken on 26 December 2021
Source Own work
Author Pi.1415926535
Camera location42° 23′ 35.08″ N, 71° 06′ 21.24″ W  Heading=157.5° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:33, 5 January 2022Thumbnail for version as of 05:33, 5 January 20225,184 × 3,888 (9.08 MB)Pi.1415926535 (talk | contribs)== {{int:filedesc}} == {{Information |Description ={{en|1=Medford Branch construction southeast of Lowell Street in December 2021. At right is the terminus of the 2015 extension of the Somerville Community Path, with the connection to the new extension.}} |Source ={{own}} |Author =Pi.1415926535 |Date ={{taken on|2021-12-26}} |Permission = |other_versions = }} {{Location|42.393077|-71.105901|heading:SSE}} == {{int:license-header}} == {{s...

Metadata