File:Stability Tunnel - GPN-2000-001246.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(3,000 × 2,383 pixels, file size: 3.74 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents
Description
English: Engineers operate the controls of the Stability Tunnel. Plans for a new tunnel to study stability problems began in the late thirties. The Stability Tunnel was authorized in 1939 and began operations in June 1941. The installation was finished in December that year with the completion of a new 10,000 Horsepower Diesel-electric generating plant. It was a single return, closed jet tunnel with a 6-foot square test section. The tunnel was disassembled and shipped to Virginia Polytechnic Institute and State University in 1958. The tunnel had two separate test sections: one for curved flow, the other for rolling flow. "The facility... simulates the motion of the aircraft in curved or rolling flight. This is done by actually curving or rolling the airstream as it passes over the model and at the same time providing the proper velocity distribution."
Date
Source Great Images in NASA Description
Author NACA
Permission
(Reusing this file)
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:
This image or video was catalogued by Langley Research Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: GPN-2000-001246 and Alternate ID: L-32200.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.
Other languages:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:41, 9 April 2009Thumbnail for version as of 03:41, 9 April 20093,000 × 2,383 (3.74 MB)BotMultichillT (talk | contribs){{Information |Description={{en|1=Engineers operate the controls of the Stability Tunnel. Plans for a new tunnel to study stability problems began in the late thirties. The Stability Tunnel was authorized in 1939 and began operations in June 1941. The ins

The following page uses this file:

Metadata