File:Start of Berm A (1005ff21-69f7-4cb6-9632-daee1e8ab343).JPG

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (6,960 × 4,640 pixels, file size: 15.79 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
English: Start of Berm A
Photographer
English: NPS Photo
Title
English: Start of Berm A
Description
English:

Dirt from Hoover Creek excavation is piled along left side of image. A pile is in the middle waiting to be spread out and sculpted into sound reducing berm.

Berm A starts to take shape from dirt excavated from Hoover Creek.

  • Keywords: Flood Mitigation; Construction; Construction Project
Depicted place
English: Herbert Hoover National Historic Site, Cedar County, Iowa
Date Taken on 22 September 2020
Accession number
Source
English: NPGallery
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.
NPS Unit Code
InfoField
HEHO
Album(s)
InfoField
English: Flood Mitigation Project Construction

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:33, 16 May 2021Thumbnail for version as of 18:33, 16 May 20216,960 × 4,640 (15.79 MB)BMacZeroBot (talk | contribs)Batch upload (Commons:Batch uploading/NPGallery)

Metadata