File:Stop 7 with construction largely completed. Temporary interpretive signage is shown at the location of a future permanent (02321d71-dc21-42b8-8db2-d0a0f5a51d30).JPG

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,032 × 3,024 pixels, file size: 5.27 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents


Summary

[edit]
English: Stop 7
Photographer
English: NPS Photo
Title
English: Stop 7
Description
English:

Part of a new blacktop path and stone sign platform are shown in lower left. A temporary sign is in the center. A cannon is in the mid-ground on the right. An open field with some trees makes up the background.

Stop 7 with construction largely completed. Temporary interpretive signage is shown at the location of a future permanent wayside.

  • Keywords: construction; Tour Road Improvement; GAOA; Saratoga NHP
Depicted place
English: Saratoga National Historical Park, Saratoga County, New York
Date Taken on 11 July 2022
Accession number
Source
English: NPGallery
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.
NPS Unit Code
InfoField
SARA
Album(s)
InfoField
English: Saratoga NHP Tour Road Improvement Project

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:10, 21 June 2023Thumbnail for version as of 17:10, 21 June 20234,032 × 3,024 (5.27 MB)BMacZeroBot (talk | contribs)Batch upload (Commons:Batch uploading/NPGallery)

Metadata