File:Entrance to Bryn Titli Wind Farm - geograph.org.uk - 398902.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Entrance_to_Bryn_Titli_Wind_Farm_-_geograph.org.uk_-_398902.jpg (640 × 485 pixels, file size: 98 KB, MIME type: image/jpeg)

Captions

Captions

Entrance to Bryn Titli Wind Farm

Summary

[edit]
Description
English: Entrance to Bryn Titli Wind Farm This board is situated at the start of the track leading up to the wind farm. From this point on the A470, the track rises approximately 200m to the plateau where the wind turbines are situated. The wind farm comprises 22 turbines, each generating 450kW (9.9MW total). For more information see http://www.npower-renewables.com/bryntitli/index.asp.
Date
Source From geograph.org.uk
Author Colin Chambers
Attribution
(required by the license)
InfoField
Colin Chambers / Entrance to Bryn Titli Wind Farm / 
Colin Chambers / Entrance to Bryn Titli Wind Farm
Camera location52° 21′ 10.4″ N, 3° 34′ 30″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location52° 21′ 10.4″ N, 3° 34′ 30″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Colin Chambers
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:36, 3 February 2011Thumbnail for version as of 17:36, 3 February 2011640 × 485 (98 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Entrance to Bryn Titli Wind Farm This board is situated at the start of the track leading up to the wind farm. From this point on the A470, the track rises approximately 200m to the plateau where th

There are no pages that use this file.

Metadata