File:HYDRAULIC CONTROLS AND GAUGES FOR THE UMBILICAL MAST ON UPPER RIGHT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751) - Vandenberg Air Force HAER CAL,42-LOMP,1B-127.tif
Jump to navigation
Jump to search
![File:HYDRAULIC CONTROLS AND GAUGES FOR THE UMBILICAL MAST ON UPPER RIGHT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751) - Vandenberg Air Force HAER CAL,42-LOMP,1B-127.tif](https://upload.wikimedia.org/wikipedia/commons/thumb/5/53/HYDRAULIC_CONTROLS_AND_GAUGES_FOR_THE_UMBILICAL_MAST_ON_UPPER_RIGHT_SIDE_OF_HYDRAULIC_CONTROL_PANEL_IN_UMBILICAL_MAST_PUMP_ROOM_%28209%29%2C_LSB_%28BLDG._751%29_-_Vandenberg_Air_Force_HAER_CAL%2C42-LOMP%2C1B-127.tif/lossy-page1-750px-thumbnail.tif.jpg?20140705013223)
Size of this JPG preview of this TIF file: 750 × 600 pixels. Other resolutions: 300 × 240 pixels | 600 × 480 pixels | 961 × 768 pixels | 1,280 × 1,023 pixels | 2,560 × 2,047 pixels | 5,000 × 3,998 pixels.
Original file (5,000 × 3,998 pixels, file size: 19.07 MB, MIME type: image/tiff)