File:Hedge End electricity substation under construction - geograph.org.uk - 1039524.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Hedge_End_electricity_substation_under_construction_-_geograph.org.uk_-_1039524.jpg(640 × 427 pixels, file size: 146 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Hedge End electricity substation under construction This new 33/11 KV substation is being built next to the railway line and to Bubb Lane. It is needed to meet increased demand due to the amount of house building in the area SE of Tollbar Way. The substation will receive power at 33 KV from Netley Common by a route which is as yet unclear. The two 33 to 11 KV transformers, or rather their oil-filled cooling systems, can be seen at right. (elevated camera position)
Date
Source From geograph.org.uk
Author Peter Facey
Attribution
(required by the license)
InfoField
Peter Facey / Hedge End electricity substation under construction / 
Peter Facey / Hedge End electricity substation under construction
Camera location50° 56′ 18″ N, 1° 18′ 08″ W  Heading=270° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location50° 56′ 18.1″ N, 1° 18′ 13″ W  Heading=270° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Peter Facey
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:01, 23 February 2011Thumbnail for version as of 18:01, 23 February 2011640 × 427 (146 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Hedge End electricity substation under construction This new 33/11 KV substation is being built next to the railway line and to Bubb Lane. It is needed to meet increased demand due to the amount of

There are no pages that use this file.

Metadata