File:KSC-05-S-00165 (ksc 062405 sssr).webm

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

KSC-05-S-00165_(ksc_062405_sssr).webm(WebM audio/video file, VP9/Opus, length 3 min 49 s, 320 × 212 pixels, 331 kbps overall, file size: 9.06 MB)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Next on the NASA Space Shuttle Status Report: Discovery's payload is loaded and ready to go_ Plus, final checkout work is in progress, readying Space Shuttle Discovery for a July launch window_ Then, the third redesigned External Tank has arrived_ And Atlantis closes its payload bay doors, gearing up for its mission to the International Space Station. NASA is preparing to Return to Flight and the Space Shuttle Status Report starts right now_ After a successful rollout to the launch pad, Discovery's payload is now loaded into the cargo bay and ready to fly into space on mission STS-114 to the International Space Station_ I'm Charlie Blackwell-Thompson, NASA test director and this is the NASA Space Shuttle Status Report. Now that Discovery is back at the launch pad awaiting the opening of a launch window that begins July 13, final checkout and testing work is now under way. On June 17, technicians removed Discovery's three payloads from their transport canister. With the help of the Payload Ground Handling Mechanism, or PGHM, they were positioned inside the orbiter. The payloads are packed with supplies for the International Space Station. The payload doors will remain open for a final inspection by the crew, then close late this month for flight. On June 22nd, the hypergolic propellants -- monomethyl hydrazine and nitrogen tetroxide -- were loaded into Discovery's Orbiter Maneuvering System and the Forward Reaction Control System. While Discovery prepares at the pad, Kennedy Space Center Media Services is preparing for the thousands of print, web, radio and television journalists planning worldwide coverage of the launch. In just a few weeks, your favorite media outlet will most likely provide launch day coverage from right here at the Kennedy Space Center. You can also watch the launch live on NASA TV and on our website, nasa.gov. Work on Space Shuttle Atlantis is picking up inside the Orbiter Processing Facility bay 1 to prepare it for a September launch. Right now, power-up system testing is nearly complete. The payload bay has been cleaned, and the doors closed for a final time before flight. Inside the Vehicle Assembly Building, or VAB, technicians are preparing Atlantis' External Tank and Solid Rocket Boosters to be attached to the orbiter. This stack was originally scheduled to fly with Discovery but will now fly on mission STS-121. Finally on this week's Space Shuttle Status Report, the third redesigned External Tank, ET-119, has arrived at Kennedy Space Center. It is also inside the VAB, where it will be prepped to fly on a future space shuttle mission. That’s all the time we have for this week’s Space Shuttle Status Report. Be sure to check back next week for the latest updates as NASA prepares for a safe Return to Flight mission to the International Space Station this July. To learn more about the Return to Flight mission, and for other mission news, log on to nasa.gov. I'm Charlie Blackwell-Thompson for the NASA Space Shuttle Status Report.
Date Taken on 24 June 2005
Source
This image or video was catalogued by Kennedy Space Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: ksc_062405_sssr.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.
Other languages:
Author NASA Kennedy Space Center
Keywords
InfoField
OV-103; RCC; OMS; RTF; Discovery; STS-114; external_tank; ET

Licensing

[edit]
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:01, 10 May 20243 min 49 s, 320 × 212 (9.06 MB)OptimusPrimeBot (talk | contribs)Imported media from http://images-assets.nasa.gov/video/ksc_062405_sssr/ksc_062405_sssr~orig.mp4

The following page uses this file:

Transcode status

Update transcode status
Format Bitrate Download Status Encode time
VP9 240P 222 kbps Completed 03:51, 10 May 2024 1 min 2 s
Streaming 240p (VP9) 117 kbps Completed 03:51, 10 May 2024 1 min 25 s
WebM 360P 442 kbps Completed 03:51, 10 May 2024 27 s
Streaming 144p (MJPEG) 593 kbps Completed 03:50, 10 May 2024 3.0 s
Stereo (Opus) 86 kbps Completed 03:51, 10 May 2024 5.0 s
Stereo (MP3) 128 kbps Completed 03:51, 10 May 2024 6.0 s

Metadata