File:The outlet (and inlet ) of the Dinorwig HEP Scheme - geograph.org.uk - 287738.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

The_outlet_(and_inlet_)_of_the_Dinorwig_HEP_Scheme_-_geograph.org.uk_-_287738.jpg(640 × 480 pixels, file size: 78 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: The outlet (and inlet ) of the Dinorwig HEP Scheme The embayment was created during the construction of the Dinorwig Power Station in the 1980s. This has resulted from raising the level of the lake which inundated the old Muriau and Hafod Owen 'sincs'. During the day water from Llyn Marchlyn Mawr is used to power the station's six generators, the water then being discharged into Llyn Peris. At night, surplus energy is used to pump water back to Marchlyn.
Date
Source From geograph.org.uk
Author Eric Jones
Attribution
(required by the license)
InfoField
Eric Jones / The outlet (and inlet ) of the Dinorwig HEP Scheme / 
Eric Jones / The outlet (and inlet ) of the Dinorwig HEP Scheme
Camera location53° 06′ 39″ N, 4° 06′ 36″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 07′ 06″ N, 4° 06′ 07″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Eric Jones
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current20:14, 14 December 2010Thumbnail for version as of 20:14, 14 December 2010640 × 480 (78 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=The outlet (and inlet ) of the Dinorwig HEP Scheme The embayment was created during the construction of the Dinorwig Power Station in the 1980s. This has resulted from raising the level of the lake

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata