File:Track renewal - Bangor station - 2002 (geograph 3786711).jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 586 pixels. Other resolutions: 320 × 234 pixels | 640 × 469 pixels | 997 × 730 pixels.
Original file (997 × 730 pixels, file size: 1.2 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionTrack renewal - Bangor station - 2002 (geograph 3786711).jpg |
English: Track renewal - Bangor station - 2002 On 18 December 2000, the Northern Ireland Assembly approved expenditure for complete track renewal between Belfast and Bangor. Work began on 13 August 2001 and was declared "complete" in July 2002 after lengthy periods of single line working and total closure. Track renewal and ballasting was well advanced at Bangor by April 2002, all taking place in the shadow of the new bus/rail interchange centre. |
Date | |
Source | From geograph.org.uk |
Author | The Carlisle Kid |
Permission (Reusing this file) |
Creative Commons Attribution Share-alike license 2.0 |
Attribution (required by the license) InfoField | The Carlisle Kid / Track renewal - Bangor station - 2002 / |
InfoField | The Carlisle Kid / Track renewal - Bangor station - 2002 |
Camera location | 54° 39′ 25.7″ N, 5° 40′ 35″ W | View this and other nearby images on: OpenStreetMap | 54.657139; -5.676277 |
---|
Object location | 54° 39′ 28.2″ N, 5° 40′ 27″ W | View this and other nearby images on: OpenStreetMap | 54.657820; -5.674220 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by The Carlisle Kid and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: The Carlisle Kid
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:50, 13 March 2022 | 997 × 730 (1.2 MB) | Lamberhurst (talk | contribs) | == {{int:filedesc}} == {{Information |Description={{en|1=<b>Track renewal - Bangor station - 2002</b><br>On 18 December 2000, the Northern Ireland Assembly approved expenditure for complete track renewal between Belfast and Bangor. Work began on 13 August 2001 and was declared "complete" in July 2002 after lengthy periods of single line working and total closure. Track renewal and ballasting was well advanced at Bangor by April 2002, all taking place in the shadow of the new bus/rail intercha... |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Structured data
Items portrayed in this file
depicts
5 April 2002
54°39'25.700"N, 5°40'34.597"W
54°39'28.15"N, 5°40'27.19"W
image/jpeg
Hidden categories:
- Information field template with formatting
- Files with coordinates missing SDC location of creation
- CC-BY-SA-2.0
- Images from Geograph Britain and Ireland
- Images from Geograph Britain and Ireland missing SDC creator
- Images from Geograph Britain and Ireland missing SDC source of file
- Images by The Carlisle Kid