File:Turbine Blade Delivery to Tower No 23 - geograph.org.uk - 977483.jpg
Turbine_Blade_Delivery_to_Tower_No_23_-_geograph.org.uk_-_977483.jpg (640 × 480 pixels, file size: 61 KB, MIME type: image/jpeg)
Captions
Captions
Summary
[edit]DescriptionTurbine Blade Delivery to Tower No 23 - geograph.org.uk - 977483.jpg |
English: Turbine Blade Delivery to Tower No 23. June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end.
At 11:00 the first of the three blades were attached to Turbine No 23. Ground crew engineers are seen here preparing the first turbine blade for the lifting operation to attach it to the hub. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008. 837293 837229 837208 824546 837248 696963 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 collett heavy transport |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Turbine Blade Delivery to Tower No 23 / |
InfoField | Paul Anderson / Turbine Blade Delivery to Tower No 23 |
Camera location | 53° 39′ 57″ N, 2° 15′ 38″ W ![]() ![]() | View this and other nearby images on: OpenStreetMap | ![]() |
---|
Object location | 53° 39′ 58″ N, 2° 15′ 39″ W ![]() ![]() | View this and other nearby images on: OpenStreetMap | ![]() |
---|
Licensing
[edit]![]() |
This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
![w:en:Creative Commons](https://upload.wikimedia.org/wikipedia/commons/thumb/7/79/CC_some_rights_reserved.svg/90px-CC_some_rights_reserved.svg.png)
![attribution](https://upload.wikimedia.org/wikipedia/commons/thumb/1/11/Cc-by_new_white.svg/24px-Cc-by_new_white.svg.png)
![share alike](https://upload.wikimedia.org/wikipedia/commons/thumb/d/df/Cc-sa_white.svg/24px-Cc-sa_white.svg.png)
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 21:58, 22 February 2011 | ![]() | 640 × 480 (61 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Turbine Blade Delivery to Tower No 23 June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end. At 11:00 the first of the three blades were attached to Tu |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|