Description
English: Turbine Blade Delivery to Tower No 23. June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end.

At 11:00 the first of the three blades were attached to Turbine No 23. Ground crew engineers are seen here preparing the first turbine blade for the lifting operation to attach it to the hub. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008.

837293 837229 837208 824546 837248 696963

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80

collett heavy transport
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Turbine Blade Delivery to Tower No 23 / 
Paul Anderson / Turbine Blade Delivery to Tower No 23
Camera location53° 39′ 57″ N, 2° 15′ 38″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current21:58, 22 February 2011Thumbnail for version as of 21:58, 22 February 2011640 × 480 (61 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Turbine Blade Delivery to Tower No 23 June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end. At 11:00 the first of the three blades were attached to Tu

There are no pages that use this file.

Metadata