File:VIEW LOOKING NORTH, VIEW OF BLAST FURNACE NO. 2 (LEFT) SHARING THE SAME CAST HOUSE WITH BLAST FURNACE NO. 1. ORE BRIDGE and BLOWER HOUSE TO RIGHT, HULETT CAR DUMPER IS IN LEFT HAER PA,65-MONE,1A-1.tif

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(5,000 × 3,745 pixels, file size: 17.86 MB, MIME type: image/tiff)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Photographer
Lowe, Jet, creator
Title
VIEW LOOKING NORTH, VIEW OF BLAST FURNACE NO. 2 (LEFT) SHARING THE SAME CAST HOUSE WITH BLAST FURNACE NO. 1. ORE BRIDGE and BLOWER HOUSE TO RIGHT, HULETT CAR DUMPER IS IN LEFT FOREGROUND. - Pittsburgh Steel Company, Monessen Works, Blast Furnace No. 1 and No. 2, Donner Avenue, Monessen, Westmoreland County, PA
Description
Pittsburgh Steel Company
Depicted place Pennsylvania; Westmoreland County; Monessen
Date 1995
date QS:P571,+1995-00-00T00:00:00Z/9
Dimensions 5 x 7 in.
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER PA,65-MONE,1A-1
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: No. 1 and No. 2 Blast Furnaces were blown-in in 1913. The two furnaces were nearly identical in design and capacity at the time of construction and shared a common cast house, an unusual arrangement. The cast house was composed of an integrated structural system comprised of brick masonry and steel. This was a common mill construction technique during this period. The plan arrangement of the cast house was such that molten iron was directed to hot metal transfer (torpedo) cards on the south side of the building, while slag was deposited into slag cars or into a slag pit on the north side.
  • Unprocessed Field note material exists for this structure: N260
  • Survey number: HAER PA-253-A
  • Building/structure dates: 1919 Initial Construction
  • Building/structure dates: 1977 Subsequent Work
  • Building/structure dates: 1985
Source https://www.loc.gov/pictures/item/pa3393.photos.359763p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:01, 1 August 2014Thumbnail for version as of 02:01, 1 August 20145,000 × 3,745 (17.86 MB) (talk | contribs)GWToolset: Creating mediafile for Fæ. HABS 31 July 2014 (3000:3200)

Metadata