File:Working on the approaches to the Pashad bridge across the Kunar River, Afghanistan.JPG

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(1,600 × 1,067 pixels, file size: 288 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents
Description Provincial Reconstruction Team-Kunar MRAPs based at Camp Wright in Asadabad, Afghanistan, cross over Konar river on the Pashad Bridge in Pashad, Afghanistan, Oct. 5, 2009 while engineers perform a progress assessment with local laborers. The PRT along with a member from the U.S. Army Corps of Engineers visited the bridge to get a progress update and check on local security surrounding the construction site. Although not officially opened, the site supervisor invited the PRT to test out the bridge quality by driving their heavy vehicles over the bridge for the first time. This bridge connects the village of Kotkia with Pashad across the Konar river. (U.S. Air Force photo/ Tech. Sgt. Brian Boisvert RELEASED)
Date Taken on 5 October 2009
Source http://prt-kunar.blogspot.com/2009/10/two-days-in-chowkay.html
Author Brian Boisvert
Permission
(Reusing this file)
Public domain
This image or file is a work of a U.S. Air Force Airman or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image or file is in the public domain in the United States.

العربية  беларуская (тарашкевіца)  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  italiano  日本語  한국어  македонски  മലയാളം  မြန်မာဘာသာ  norsk bokmål  Plattdüütsch  Nederlands  polski  português  português do Brasil  русский  sicilianu  slovenčina  slovenščina  српски / srpski  svenska  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

This image was released by the United States Air Force with the ID 091005-F-2703B-082 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:16, 8 May 2010Thumbnail for version as of 13:16, 8 May 20101,600 × 1,067 (288 KB)Geo Swan (talk | contribs){{Information |Description= Provincial Reconstruction Team-Kunar MRAPs based at Camp Wright in Asadabad, Afghanistan, cross over Konar river on the Pashad Bridge in Pashad, Afghanistan, Oct. 5, 2009 while engineers perform a progress assessment with local

There are no pages that use this file.

Metadata