File:'Charge up to a net zero installation' 130226-A-UK859-025.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(6,016 × 4,000 pixels, file size: 14.52 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Tabitha Crawford, senior vice-president of sustainability and innovation for Balfour Beatty Investments, delivers the keynote address at the ribbon cutting ceremony to plug in the first wave of solar panels on Fort Bliss, Texas housing units, Feb. 26, 2013. (U.S. Army photo by Sgt. Barry St.Clair/Released)
Unit: 24th Press Camp Headquarters
DVIDS Tags: Fort Bliss; energy; El Paso; Solar; BBC; sustainability; Texas; Net Zero; Balfour; Barry St. Clair; Beatty; Charging Up
Date Taken on 26 February 2013
Source https://www.dvidshub.net/image/874659/charge-up-net-zero-installation
Author Sgt. Barry St. Clair
Location
InfoField
FORT BLISS, TX, US
VIRIN
InfoField

This image was released by the United States Army with the ID 130226-A-UK859-025 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Search DVIDs
Posted
InfoField
26 February 2013, 20:44
Archive link
InfoField
archive copy at the Wayback Machine

Licensing

[edit]
Public domain
This file is a work of a U.S. Army soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

العربية  বাংলা  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  hrvatski  magyar  Bahasa Indonesia  italiano  日本語  한국어  lietuvių  македонски  മലയാളം  မြန်မာဘာသာ  Nederlands  polski  português  русский  sicilianu  српски / srpski  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:21, 23 February 2017Thumbnail for version as of 02:21, 23 February 20176,016 × 4,000 (14.52 MB) (talk | contribs)DVIDS 22 megapixel image from https://www.dvidshub.net/image/874659/charge-up-net-zero-installation. Fort Bliss; energy; El Paso; Solar. Part of User:Fæ/Project list/DoD

There are no pages that use this file.

Metadata