File:American hydroelectric practice; a compilation of useful data and information on the design, construction and operation of hydroelectric systems, from the penstocks to distribution lines (1917) (14783027733).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,864 × 1,940 pixels, file size: 1.43 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English:

Identifier: americanhydroele00tayl (find matches)
Title: American hydroelectric practice; a compilation of useful data and information on the design, construction and operation of hydroelectric systems, from the penstocks to distribution lines
Year: 1917 (1910s)
Authors: Taylor, William T. (William Thomas), b. 1877 Braymer, Daniel Harvey, 1883-1932
Subjects: Hydroelectric power plants
Publisher: New York, McGraw-Hill Book Company, inc.
Contributing Library: Northeastern University, Snell Library
Digitizing Sponsor: Boston Library Consortium Member Libraries

View Book Page: Book Viewer
About This Book: Catalog Entry
View All Images: All Images From Book
Click here to view book online to see this illustration in context in a browseable online version of this book.

Text Appearing Before Image:
XiOS CObi) .0 d&o o>» 03 ^ CO bi) 5 LOW, MEDIUM AND HIGH HEAD DEVELOPMENTS 71 O o d 3 ^ T ^ J3 H T aj 50 a a • 1. a Q. ^ o t-i 3 o ^ d 0) •o s m O) u 6! <s « S sn - +i p ,g m o +2 rt ca o a ^^ 00 tu
Text Appearing After Image:
72 HYDROELECTRIC PRACTICE In the generating station there is only one disconnecting switch at eachgenerator terminal and one similar switch for the neutral, the latter beinggrounded through a common neutral resistance calculated for two and one-half times the normal rating of one generator under thirty seconds. Cost of Development.—Another very interesting point about this de-velopment is its total cost per hp. developed, which is as follows: Water rights and real estate $223,640 Dwelling and Engineering 17,240 Dam, Flume and Tunnels 478,980 Generating Station and Switch house (buildings) 102,320 Machinery: Turbines and governors $31,720 Generators 64,250 Transformers 28,290 Switch-gear 42,360 166,620 Total cost $988,800 Cost per hp., $49.00 XI. Gatum Hydroelectric Station for Panama CanalThe Gatum station shown in Fig. 40 is 61 ft. wide by 137 ft. long and hasan extreme height of 74 ft. The building is designed on the unit principleto admit of future extension, and consists of a si

Note About Images

Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.
Date
Source

https://www.flickr.com/photos/internetarchivebookimages/14783027733/

Author

Taylor, William T. (William Thomas), b. 1877;

Braymer, Daniel Harvey, 1883-1932
Permission
(Reusing this file)
At the time of upload, the image license was automatically confirmed using the Flickr API. For more information see Flickr API detail.
Flickr tags
InfoField
Flickr posted date
InfoField
28 July 2014



Licensing[edit]

This image was taken from Flickr's The Commons. The uploading organization may have various reasons for determining that no known copyright restrictions exist, such as:
  1. The copyright is in the public domain because it has expired;
  2. The copyright was injected into the public domain for other reasons, such as failure to adhere to required formalities or conditions;
  3. The institution owns the copyright but is not interested in exercising control; or
  4. The institution has legal rights sufficient to authorize others to use the work without restrictions.

More information can be found at https://flickr.com/commons/usage/.


Please add additional copyright tags to this image if more specific information about copyright status can be determined. See Commons:Licensing for more information.
This image was originally posted to Flickr by Internet Archive Book Images at https://flickr.com/photos/126377022@N07/14783027733. It was reviewed on 14 October 2015 by FlickreviewR and was confirmed to be licensed under the terms of the No known copyright restrictions.

14 October 2015

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:02, 14 October 2015Thumbnail for version as of 17:02, 14 October 20152,864 × 1,940 (1.43 MB)SteinsplitterBot (talk | contribs)Bot: Image rotated by 90°
13:35, 14 October 2015Thumbnail for version as of 13:35, 14 October 20151,940 × 2,872 (1.39 MB) (talk | contribs)== {{int:filedesc}} == {{information |description={{en|1=<br> '''Identifier''': americanhydroele00tayl ([https://commons.wikimedia.org/w/index.php?title=Special%3ASearch&profile=default&fulltext=Search&search=insource%3A%2Famericanhydroele00tayl%2F fin...

There are no pages that use this file.