File:Solar project at Fort Hunter Liggett 130312-A-AN535-022.jpg
Original file (4,928 × 3,264 pixels, file size: 2.79 MB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionSolar project at Fort Hunter Liggett 130312-A-AN535-022.jpg |
English: Solar panel arrays form a canopy at a construction site in Fort Hunter Liggett, Calif., March 12, 2013. The construction site is for phase one and two of a solar microgrid project at the installation, managed by the U.S. Army Corps of Engineers Sacramento District. Phase one was completed in April 2012 and generates one megawatt of power, enough energy to power 250 to 300 homes. Phase two, scheduled for completion in May 2013, will generate an additional one megawatt of power and is expected to be the second of four at the post. The Sacramento District awarded contracts of $8.4 million for phase one and $9.7 million for phase two. Along with the energy production, the cover provided by the panel arrays will shade the majority of the post’s vehicles. Fort Hunter Liggett is one of six pilot installations selected by the U.S. Army to be net zero energy, meaning the installation will create as much energy as it uses. (U.S. Army photo by John Prettyman/Released)
|
|||
Date | Taken on 12 March 2013 | |||
Source | https://www.dvidshub.net/image/899840/solar-project-fort-hunter-liggett | |||
Author | John Prettyman | |||
Location InfoField | SACRAMENTO, CA, US | |||
VIRIN InfoField |
|
|||
Posted InfoField | 3 April 2013, 14:13 | |||
Archive link InfoField | archive copy at the Wayback Machine |
Licensing
[edit]Public domainPublic domainfalsefalse |
This file is a work of a U.S. Army soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.
العربية ∙ বাংলা ∙ català ∙ čeština ∙ Deutsch ∙ English ∙ español ∙ eesti ∙ فارسی ∙ suomi ∙ français ∙ hrvatski ∙ magyar ∙ Bahasa Indonesia ∙ italiano ∙ 日本語 ∙ 한국어 ∙ lietuvių ∙ македонски ∙ മലയാളം ∙ မြန်မာဘာသာ ∙ Nederlands ∙ polski ∙ português ∙ русский ∙ sicilianu ∙ српски / srpski ∙ Türkçe ∙ українська ∙ Tiếng Việt ∙ 中文(简体) ∙ 中文(繁體) ∙ +/− |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 02:18, 23 February 2017 | 4,928 × 3,264 (2.79 MB) | Fæ (talk | contribs) | DVIDS 15 megapixel image from https://www.dvidshub.net/image/899840/solar-project-fort-hunter-liggett. energy; solar; Corps of Engineers; Sacramento District. Part of User:Fæ/Project list/DoD |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | NIKON CORPORATION |
---|---|
Camera model | NIKON D5100 |
Exposure time | 1/800 sec (0.00125) |
F-number | f/5.6 |
ISO speed rating | 200 |
Date and time of data generation | 15:34, 12 March 2013 |
Lens focal length | 18 mm |
Short title | 130312-A-AN535-022 |
Author | U.S. Army Corps of Engineers, John Prettyman |
Headline | Solar project at Fort Hunter Liggett |
Image title | Solar panel arrays form a canopy at a construction site in Fort Hunter Liggett, Calif., March 12, 2013. The construction site is for phase one and two of a solar microgrid project at the installation, managed by the U.S. Army Corps of Engineers Sacramento District. Phase one was completed in April 2012 and generates one megawatt of power, enough energy to power 250 to 300 homes. Phase two, scheduled for completion in May 2013, will generate an additional one megawatt of power and is expected to be the second of four at the post. The Sacramento District awarded contracts of $8.4 million for phase one and $9.7 million for phase two. Along with the energy production, the cover provided by the panel arrays will shade the majority of the post's vehicles. Fort Hunter Liggett is one of six pilot installations selected by the U.S. Army to be net zero energy, meaning the installation will create as much energy as it uses. (U.S. Army photo by John Prettyman/Released) |
City shown | Sacramento |
Credit/Provider | U.S. Army |
Source | Digital |
Copyright holder | Public Domain |
Width | 4,928 px |
Height | 3,264 px |
Bits per component |
|
Pixel composition | RGB |
Orientation | Normal |
Number of components | 3 |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | Adobe Photoshop CS6 (Windows) |
File change date and time | 10:10, 19 March 2013 |
Y and C positioning | Co-sited |
Exposure Program | Aperture priority |
Exif version | 2.3 |
Date and time of digitizing | 15:34, 12 March 2013 |
Meaning of each component |
|
Image compression mode | 2 |
APEX shutter speed | 9.643856 |
APEX aperture | 4.970854 |
APEX exposure bias | 0.33333333333333 |
Maximum land aperture | 3.6 APEX (f/3.48) |
Metering mode | Pattern |
Light source | Unknown |
Flash | Flash did not fire |
DateTime subseconds | 2 |
DateTimeOriginal subseconds | 2 |
DateTimeDigitized subseconds | 2 |
Supported Flashpix version | 1 |
Color space | sRGB |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 27 mm |
Scene capture type | Standard |
Scene control | None |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Unknown |
GPS tag version | 2.3.0.0 |
Serial number of camera | 3097834 |
Lens used | 18.0-55.0 mm f/3.5-5.6 |
Date metadata was last modified | 03:10, 19 March 2013 |
Unique ID of original document | A951D24A5F3CC44C03A0B30785612130 |
Keywords |
|
Province or state shown | CA |
Code for country shown | US |
Special instructions | Released
John Prettyman U.S. Army Corps of Engineers john.r.prettyman@usace.army.mil via DVIDS |
Original transmission location code | U.S. Army |
Country shown | United States |